General Conditions of Contract10.2 A joint programme of execution of the WORK will be prepared bythe ENGINEER-IN-CHARGE and CONTRACTOR based onpriority requirement of this project. This programme will take intoaccount the time of completion mentioned in 10.1 above and thetime allowed for the priority works by theENGINEER-IN-CHARGE.10.3 Monthly/Weekly construction programme will; be drawn up by theENGINEER-IN-CHARGE jointly with the CONTRACTOR, basedon availability of work fronts and the joint construction programmeas per 10.2 above. The CONTRACTOR shall scrupulouslyadhere to these targets /programmes by deploying adequatepersonnel, construction tools and tackles and he shall also supplyhimself all materials of his scope of supply in good time to achievethe targets/programmes. In all matters concerning the extent oftargets set out in the weekly and monthly programmes and thedegree of achievements the decision of theENGINEER-IN-CHARGE will be final and binding on theCONTRACTOR.11 Tenderer’s Responsibility 11.1 The intending tenderers shall be deemed to have visited the SITEand familiarised submitting the tender. Non-familiarity with thesite conditions will not be considered a reason either for extraclaims or for not carrying out the works in strict conformity with theDRAWINGS and SPECIFICATIONS or for any delay inperformance.12 Retired Government orCompany Officers12.1 No Engineer of Gazetted rank or other Gazetted Officer employedin Engineering or Administrative duties in an EngineeringDepartment of the States/ Central Government or of theEMPLOYER is allowed to work as a CONTRACTOR for a periodof two years after his retirement from Government Service, or fromthe employment of the EMPLOYER without the previouspermission of the EMPLOYER. The CONTRACT, if awarded, isliable to be cancelled if either the CONTRACTOR or any of hisemployees is found at any time to be such a person, who has notobtained the permission of the State/Central Government or of theEMPLOYER as aforesaid before submission of tender, orengagement in the CONTRACTOR'S service as the case may be.13 Signing of the Contract: 13.1 The successful tenderer shall be required to execute anAGREEMENT in the proforma attached with TENDERDOCUMENT within 15 days of the receipt by him of theNotification of Acceptance of Tender. In the event of failure onthe part of the successful tenderer to sign the AGREEMENT withinthe above stipulated period, the Earnest Money or his initialdeposit will be forefeited and the acceptance of the tender shall beconsidered as cancelled.14 Field Management &Controlling/CoordinatingAuthority:14.1 The field management will be the responsibility of theENGINEER-IN-CHARGE, who will be nominated by theEMPLOYER. The ENGINEER-IN-CHARGE may also authorisehis representatives to assist in performing his duties and functions.14.2 The ENGINEER-IN-CHARGE shall coordinate the works ofvarious agencies engaged at site to ensure minimum disruption ofwork carried out by different agencies. It shall be the responsibilityof the CONTRACTOR to plan and execute the work strictly inaccordance with site instructions to avoid hindrance to the workbeing executed by other agencies.12

General Conditions of Contract15 Note to Schedule ofRates:15.1 The Schedule of Rates should be read in conjunction with all theother sections of the tender.15.2 The tenderer shall be deemed to have studied the DRAWINGS,SPECIFICATIONS and details of work to be done within TIMESCHEDULE and to have aquainted himself of the conditionprevailing at site.15.3 Rates must be filled in the Schedule of Rates of original TenderDocuments. If quoted in separate typed sheets no variation in itemdescription or specification shall be accepted. Any exceptionstaken by the tenderer to the Schedule of Rates shall be broughtout in the terms and conditions of the offer.15.4 The quantities shown against the various items are onlyapproximate. Any increase or decrease in the quantities shall notform the basis of alteration of the rates quoted and accepted.15.5 The EMPLOYER reserves the right to interpolate the rates for suchitems of work falling between similar items of lower and highermagnitude.16 Policy for Tenders UnderConsideration:16.1 Only Those Tenders which are complete in all respects and arestrictly in accordance with the Terms and Conditions andTechnical Specifications of Tender Document, shall be consideredfor evaluation. Such Tenders shall be deemed to be underconsideration immediately after opening of Tender and until suchtime an official intimation of acceptance /rejection of Tender ismade by GAIL to the Bidder.16.2 Zero Deviation: Bidders to note that this is a ZERO DEVIATIONTENDER. GAIL will appreciate submission of offer based on theterms and conditions in the enclosed General Conditions ofContract (GCC), Special Conditions of Contract (SCC),Instructions to Bidders (ITB), Scope of Work, technicalspecifications etc. to avoid wastage of time and money inseeking clarifications on technical/ commercial aspects of theoffer. Bidder may note that no technical and commercialclarifications will be sought for after the receipt of the bids. Incase of any deviation/nonconformity observed in the bid, it willbe liable for rejection.17 Award of Contract: 17.1 The Acceptance of Tender will be intimated to the successfulTenderer by GAIL either by Telex/ Telegram/ Fax or by Letter orlike means-defined as LETTER OF ACCEPTANCE OF TENDER.17.2 GAIL will be the sole judge in the matter of award of CONTRACTand the decision of GAIL shall be final and binding.18 Clarification of TenderDocument:18.1 The Tender is required to carefully examine the TechnicalSpecifications, Conditions of Contract, Drawings and other detailsrelating to WORK and given in Tender Document and fully informhimself as to all conditions and matters which may in any wayaffect the WORK or the cost thereof. In case the Tenderer is indoubt about the completeness or correctness of any of thecontents of the Tender Documents he should request in writing foran interpretation/clarification to GAIL in triplicate. GAIL will then13

General Conditions of Contract10.2 A joint programme of execution of the WORK will be prepared bythe ENGINEER-IN-CHARGE and CONTRACTOR based onpriority requirement of this project. This programme will take intoaccount the time of completion mentioned in 10.1 above and thetime allowed for the priority works by theENGINEER-IN-CHARGE.10.3 Monthly/Weekly construction programme will; be drawn up by theENGINEER-IN-CHARGE jointly with the CONTRACTOR, basedon availability of work fronts and the joint construction programmeas per 10.2 above. The CONTRACTOR shall scrupulouslyadhere to these targets /programmes by deploying adequatepersonnel, construction tools and tackles and he shall also supplyhimself all materials of his scope of supply in good time to achievethe targets/programmes. In all matters concerning the extent oftargets set out in the weekly and monthly programmes and thedegree of achievements the decision of theENGINEER-IN-CHARGE will be final and binding on theCONTRACTOR.11 Tenderer’s Responsibility 11.1 The intending tenderers shall be deemed to have visited the SITEand familiarised submitting the tender. Non-familiarity with thesite conditions will not be considered a reason either for extraclaims or for not carrying out the works in strict conformity with theDRAWINGS and SPECIFICATIONS or for any delay inperformance.12 Retired Government orCompany Officers12.1 No Engineer of Gazetted rank or other Gazetted Officer employedin Engineering or Administrative duties in an EngineeringDepartment of the States/ Central Government or of theEMPLOYER is allowed to work as a CONTRACTOR for a periodof two years after his retirement from Government Service, or fromthe employment of the EMPLOYER without the previouspermission of the EMPLOYER. The CONTRACT, if awarded, isliable to be cancelled if either the CONTRACTOR or any of hisemployees is found at any time to be such a person, who has notobtained the permission of the State/Central Government or of theEMPLOYER as aforesaid before submission of tender, orengagement in the CONTRACTOR'S service as the case may be.13 Signing of the Contract: 13.1 The successful tenderer shall be required to execute anAGREEMENT in the proforma attached with TENDERDOCUMENT within 15 days of the receipt by him of theNotification of Acceptance of Tender. In the event of failure onthe part of the successful tenderer to sign the AGREEMENT withinthe above stipulated period, the Earnest Money or his initialdeposit will be forefeited and the acceptance of the tender shall beconsidered as cancelled.14 Field Management &Controlling/CoordinatingAuthority:14.1 The field management will be the responsibility of theENGINEER-IN-CHARGE, who will be nominated by theEMPLOYER. The ENGINEER-IN-CHARGE may also authorisehis representatives to assist in performing his duties and functions.14.2 The ENGINEER-IN-CHARGE shall coordinate the works ofvarious agencies engaged at site to ensure minimum disruption ofwork carried out by different agencies. It shall be the responsibilityof the CONTRACTOR to plan and execute the work strictly inaccordance with site instructions to avoid hindrance to the workbeing executed by other agencies.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!