11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of ContractCONTRACTOR shall fail to comply with these requirements, theENGINEER-IN-CHARGE may at he expenses of theCONTRACTOR remove such surplus, and rubbish materials anddispose off the same as he deems fit and get the site cleared asaforesaid; and CONTRACTOR shall forthwith pay the amount ofall expenses so incurred and shall have no claim in respect of anysuch surplus materials disposed off as aforesaid. But theEMPLOYER reserves the right to ask the CONTRACTOR anytime during the pendency of the CONTRACT to vacate the land bygiving 7 days notice on security reasons or on national interest orotherwise. Rent may be charged for the land so occupied fromcontractor by the Employer.The CONTRACTOR shall put up temporary structures as requiredby them for their office, fabrication shop and construction storesonly in the area allocated to them on the project site by theEMPLOYER or his authorised representative. No teastalls/canteens should be put up or allowed to be put up by anyCONTRACTOR in the allotted land or complex area withoutwritten permission of the EMPLOYER.No unauthorised buildings, constructions or structures should beput up by the CONTRACTOR anywhere on the project site.For uninterrupted fabrication work, the CONTRACTOR shall putup temporary covered structures at his cost within Area in thelocation allocated to them in the project site by the EMPLOYER orhis authorised representative.No person except for authorised watchman shall be allowed tostay in the plant area/CONTRACTOR's area after completion ofthe day's job without prior written permission fromENGINEER-IN-CHARGE.2.6 Land for Residential Accommodation:-:No Land shall be madeavailable for residential accommodation for staff and labour ofCONTRACTOR.SECTION-III GENERAL INSTRUCTIONS TO TENDERERS3. Submission of Tender: 3.1 TENDER must be submitted without making any additions,alterations, and as per details given in other clauses hereunder.The requisite details shall be filled in by the TENDERER at spaceprovided under “Submission of Tender at the beginning of GCC ofTender Document. The rate shall be filled only in the schedulegiven in this Tender Document.3.2 Addenda/Corrigenda to this Tender Document, if issued, must besigned, submitted alongwith the Tender Document. the tenderershould write clearly the revised quantities in Schedule of Rates ofTender Document and should price the WORK based on revisedquantities when amendments of quantities are issued in addenda.3.3 Covering letter alongwith its enclosures accompanying the TenderDocument and all further correspondence shall be submitted induplicate.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!