11.07.2015 Views

Upreti, Trilochan, International Watercourses Law and Its Application ...

Upreti, Trilochan, International Watercourses Law and Its Application ...

Upreti, Trilochan, International Watercourses Law and Its Application ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

314 / <strong>International</strong> <strong>Watercourses</strong> <strong>Law</strong> <strong>and</strong> <strong>Its</strong> <strong>Application</strong> in South Asia Appendix / 315territory at the Jimuwa Village in MahendranagarMunicipal area <strong>and</strong> a certain portion of the No-Man’s L<strong>and</strong>on either side of the border. The Nepalese l<strong>and</strong> consented tobe so used <strong>and</strong> the l<strong>and</strong> lying on the west of the saidl<strong>and</strong> )about 9 hectares) up to the Nepal India border whichforms a part for the poundage area, including the naturalresources endowment lying within the area, remains underthe continued sovereignty <strong>and</strong> control of Nepal <strong>and</strong>.2. In lieu of the eastern afflux bund of the Tanakpur Barrrage,at Jimuwa thus constructed, Nepal shall have the right to-(a) a supply of 28.35 m3/s (1000ft3/s) of water in the wetseason(i. e. from 15 th May to 15 th October) <strong>and</strong> 8.50m3/s (300ft3/s) in the dry season (i. e. from 16 thOctober to 14 th May) from the date for the entry intoforce of this Treaty. For this purposes of Article 1herein, India shall construct the head regulator (s) nearthe left undersluice of the Tanakpur Barrage <strong>and</strong> alsothe waterways of the required capacity up to the Nepal-India border. Such head regulator(s) <strong>and</strong> waterwaysshall be operated jointly.(b) a supply of 70 millions kilowatt-hour (units) of energyon a continuous basis annually, free of cost, from thedate of the entry into force of this Treaty. For thispurpose, India shall construct a 132 K v transmissionline up to the Nepal-India border from the TanakpurPower Station (which has, at present, an installedcapacity of 120,000 kilowatt generating 448.4 millionskilowatt-hour of energy annually on 90 percentdependable year flow).3. Following arrangement shall be made at the TanakpurBarrage, at the time of development of any storage project(s) including Pancheshwar Multipurpose Project upstreamof the Tanakpur Barrage.(a) Additional head regulator <strong>and</strong> necessary waterways, asrequired, up to the Nepal-India border shall beconstructed to supply additional water to Nepal. Suchhead regulator <strong>and</strong> waterways shall be operated jointly.(b) Nepal shall have additional energy equal to half of theincremental energy generated from the TanakpurPower Station, on a continuous basis from the date ofaugmentation of the flow of the Mahakali River <strong>and</strong>shall bear half of the additional operation cost <strong>and</strong>, ifrequired, half of the additional capital cost at theTanakpur Power Station for the generation of suchincremental energy.Article 3Pancheshwar Multipurpose Project (hereinafter referred to asthe “Project”) is to be constructed on a stretch of the MahakaliRiver where it forms the boundary between the two countries<strong>and</strong> hence both the parties agree that they have equalentitlement in the utilization of the waters of the MahakaliRiver without prejudice to their respective existingconsumptive uses of the waters of the Mahakali River.Therefore, both Parties agree to implement the Project in theMahakali River is accordance with the Detailed Project Report(DPR) being jointly prepared by them. The Project shall bedesigned <strong>and</strong> implemented on the basis of the followingprinciples:1. The Project shall, as would be agreed between theParties, be designed to produce the maximum total netbenefit. All benefits accruing to both the Parties withthe development of the Project in the forms of power,irrigation, flood control etc., shall be assessed.2. The Project shall be implemented or caused to beimplemented as an integrated project including powerstations shall be operated in an integrated manner <strong>and</strong>the total energy generated shall be shared equallybetween the Parties.3. The cost of the project shall be borne by the Parties inproportion to the benefits accruing to them. Both the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!