11.07.2015 Views

STEEL AT WORK - Victor Buyck Steel Construction

STEEL AT WORK - Victor Buyck Steel Construction

STEEL AT WORK - Victor Buyck Steel Construction

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

References2007 - Zelzate, BelgiumArcelor Mittal Gent, degassinginstallation, 3.000 T2006 - Amsterdam, The Netherlands- Metro station AmsterdamBijlmer, 3.000 T2006 - Bremen, GermanyCable-stayed bridge on theA281, 3.700 T2007, Kingston, JamaicaCement factory, 2.200 T2008 - Boulogne-Billancourt(Paris), FrancePont Renault, 1.750 T2005 - Kanne, BelgiumSuspension bridge over theAlbert Canal, 1.800 T2008 - TrinidadCRH/UBH Interchange,2.300 T2009 - QatarSidra Trees, 5.300 T2007 - Utrecht, The NetherlandsHogeweidebrug, 2.200 T2004 - Canary Wharf, London,UK, BP1, 4.800 T2007 - Aéroport Charles deGaulle, Paris, FranceSatellite S3 Lot SB, 14.500 T

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!