STEEL AT WORK - Victor Buyck Steel Construction
STEEL AT WORK - Victor Buyck Steel Construction
STEEL AT WORK - Victor Buyck Steel Construction
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
References2007 - Zelzate, BelgiumArcelor Mittal Gent, degassinginstallation, 3.000 T2006 - Amsterdam, The Netherlands- Metro station AmsterdamBijlmer, 3.000 T2006 - Bremen, GermanyCable-stayed bridge on theA281, 3.700 T2007, Kingston, JamaicaCement factory, 2.200 T2008 - Boulogne-Billancourt(Paris), FrancePont Renault, 1.750 T2005 - Kanne, BelgiumSuspension bridge over theAlbert Canal, 1.800 T2008 - TrinidadCRH/UBH Interchange,2.300 T2009 - QatarSidra Trees, 5.300 T2007 - Utrecht, The NetherlandsHogeweidebrug, 2.200 T2004 - Canary Wharf, London,UK, BP1, 4.800 T2007 - Aéroport Charles deGaulle, Paris, FranceSatellite S3 Lot SB, 14.500 T