- Page 1 and 2: Layout & DesiG nGUIDELINESforMarina
- Page 3 and 4: Special AcknowledgmentDepartment of
- Page 5 and 6: D3. Material Pile Types 38D3.1 Conc
- Page 7 and 8: contractors, marina owners and oper
- Page 9 and 10: oarding floatboarding piera platfor
- Page 12 and 13: mean lower low water (MLLW)a tidal
- Page 16 and 17: SECTION BW A T E R A R E A SB1. Gen
- Page 18 and 19: B4.1.3 In cases where the berth len
- Page 20 and 21: BerthLengths(ft)Table B-6 Single Be
- Page 22 and 23: SECTION B Water Areas - Page 15
- Page 24 and 25: Table B-8DOUBLE BERTH LAYOUT PLANNI
- Page 26 and 27: B5. Minimum Required Number of Acce
- Page 28 and 29: SECTION CB E R T H I N GC1. Dimensi
- Page 30 and 31: C1.2.2 Main Walkways - Maximum Leng
- Page 32 and 33: C2.2.3 ULL of 40#/ft 2 may benecess
- Page 34 and 35: definition of “near” cannot bei
- Page 36 and 37: C6. PontoonsC6.1 Pontoons in floati
- Page 38 and 39: C6.8.2 Circular pontoons load in a
- Page 40 and 41: circumstances. Swing moorings work
- Page 42 and 43: as a two, three or four-boat maximu
- Page 44 and 45: SECTION DG U I D E P I L E SD1. Gen
- Page 46 and 47: D3.1 Concrete Piles. Prestressedcon
- Page 48 and 49: D3.3.1 Pressure treatment is necess
- Page 50 and 51: SECTION EU T I L I T I E SE1. Utili
- Page 52 and 53: fueling stations and other marina s
- Page 54 and 55: E4.11.2 Dry standpipes have exactly
- Page 56 and 57: E5.8 It is highly recommended that
- Page 58 and 59: SECTION FS H O R E L I N E S T R U
- Page 60 and 61: F2.6.1.3 Openings in guard rails sh
- Page 62 and 63: encroachment into the minimum clear
- Page 64 and 65:
Exception 4.In facilities containin
- Page 66 and 67:
SECTION GL A N D A R E A SG1. Vehic
- Page 68 and 69:
G1.3.Minimum Parking Space Dimensio
- Page 70 and 71:
G2.7 Restroom buildings shall be ba
- Page 72 and 73:
APPENDIX ASECTIONS B-GC O M M E N T
- Page 74 and 75:
APPENDIX ASECTION B - WATER AREASC
- Page 76 and 77:
APPENDIX ASECTION C - BERTHINGC O M
- Page 78 and 79:
season, nor is it too liberal to me
- Page 80 and 81:
...................................
- Page 82 and 83:
maintained in river environments in
- Page 84 and 85:
shut down for several weeks in May
- Page 86 and 87:
C3.3 DL + LPLCommentary:Using the D
- Page 88 and 89:
galvanized water tank, for example,
- Page 90 and 91:
applications. Dock storage boxes in
- Page 92 and 93:
enter the pontoon. This will dimini
- Page 94 and 95:
Many RPL product advertisements cla
- Page 96 and 97:
competent inspection during the man
- Page 98 and 99:
center of gravity, work well on boa
- Page 100 and 101:
Extreme Example #1: The original mo
- Page 102 and 103:
APPENDIX ASECTION D - GUIDE PILESC
- Page 104 and 105:
casting yard must be diligent to in
- Page 106 and 107:
driving industry, butt first drivin
- Page 108 and 109:
APPENDIX ASECTION E - UTILITIESC O
- Page 110 and 111:
...................................
- Page 112 and 113:
structures. With its high expansion
- Page 114 and 115:
consideration must be given to the
- Page 116 and 117:
asin water surface areas required f
- Page 118 and 119:
When potable water lines and hosebi
- Page 120 and 121:
APPENDIX ASECTION F - SHORESIDE STR
- Page 122 and 123:
...................................
- Page 124 and 125:
surface colors also can have a nega
- Page 126 and 127:
change in a primary function and co
- Page 128 and 129:
APPENDIX A - COMMENTARYSECTION G -
- Page 130 and 131:
...................................
- Page 132 and 133:
APPENDIX BADAAG 15.2 / ADA-ABA 1003
- Page 134 and 135:
4.8.2 shall not apply to the gangwa
- Page 136 and 137:
15.2.3.1 Dispersion. Accessible boa
- Page 138 and 139:
inches (1525 mm) wide minimum.EXCEP