11.07.2015 Views

Rocky Brushy Creek Watershed Mgmt. Plan (2007) -- Part 2

Rocky Brushy Creek Watershed Mgmt. Plan (2007) -- Part 2

Rocky Brushy Creek Watershed Mgmt. Plan (2007) -- Part 2

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WATER SUPPLYPumpage from Northwest Hillsborough Wellfields, 1993-20026260585654MGD52504846441993 1994 1995 1996 1997 1998 1999 2000 2001 2002YearFigure 9-3 Groundwater Withdrawals-Northwest Hillsborough Public Supply Facilities(Source: SWFWMD, Estimated Water Use, 2002)Currently, the average production limit for the public supply facilities in the Northwest Hillsborougharea totals 57.5 mgd (Table 9-1).Table 9-1Average Production Limits (mgd) for the Public Supply Facilitiesin the Northwest Hillsborough AreaWATER SUPPLY FACILITY AVERAGE PRODUCTION DESTINATION OF WATERLIMIT (MGD)PUMPEDEldridge – Wilde Wellfield 26.5 SK Keller pumping stationNorthwest Regional Wellfield 10 Cosme treatment plant and NWHillsborough treatment facilityCosme-Odessa 11 Cosme treatment plantSection 21 10 Lake Park treatment plantTOTAL 57.59-8 <strong>Rocky</strong>/<strong>Brushy</strong> <strong>Creek</strong> <strong>Watershed</strong> Management <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!