11.07.2015 Views

Part I - Other Considerations - Richmond Valley Council

Part I - Other Considerations - Richmond Valley Council

Part I - Other Considerations - Richmond Valley Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Richmond</strong> <strong>Valley</strong> Development Control Plan 2012Alternative solutions involving reduced Asset Protection Zones may beconsidered on merit but will be subject to approval of the NSW Rural FireService.(3) Foreshore Building Line SetbacksThe Foreshore Building Line Setback shall apply to all land fronting rivers,creeks, streams, waterways, or estuaries having a:‣ W1 Natural Waterways, or‣ W2 Recreational Waterways,zoning under the <strong>Richmond</strong> <strong>Valley</strong> Local Environmental Plan 2012 – LandZone Map.The minimum foreshore setback for development shall be:R1RU5INAll other zonesZoneGeneral ResidentialVillageGeneral IndustryMinimum Foreshore BuildingLine Setback‣ 15 metres‣ 40 metresThe setback shall be measured from:‣ the mean high water mark—where the waterway is tidal, or‣ the shoreline—where the waterway is non-tidal.Note. For the purposes of this Chapter, where there is difficulty defining theshoreline it will be taken as the bottom of the waterway’s embankment.(a) Exceptions to the Foreshore Building LineExceptions to the Foreshore Building Line may be granted for that part of adevelopment involving structures such as boat sheds, boat ramps, moorings,jetties or the like, but only where it can be demonstrated that:‣ the development will have minimal significance to the stability of thebank,‣ the development will involve minimal clearing of riparian vegetation,‣ the development will not impact upon the amenity of the foreshore area,‣ the development can be safely located within a high velocity floodway (ifapplicable), and‣ it is essential for the development to be located close to the foreshore.Note. Regard must also be had to the heads of consideration contained withinClause 6.8 - Riparian Land and Watercourses.(b) Controlled Activities within 40 metres of Waterfront LandSection 91(2) of the Water Management Act 2000 requires approval toundertake controlled activities, being the:‣ erection of a building or the carrying out of a work,<strong>Part</strong> I – <strong>Other</strong> <strong>Considerations</strong> – Setbacks and Building Height I.44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!