Improvement of FPA Laboratory - Fertilizer and Pesticide Authority
Improvement of FPA Laboratory - Fertilizer and Pesticide Authority
Improvement of FPA Laboratory - Fertilizer and Pesticide Authority
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TECHNICAL SPECIFICATIONS<strong>Improvement</strong> <strong>of</strong> <strong>FPA</strong> <strong>Laboratory</strong>Approved Budget for the Contract = PhP 750,000.00Item No. Scope <strong>of</strong> Works Quantity Unit17 Electrical Tape 14.00 rollc. Panel BoardMain 150AT, 3P, 220 V, 225 AF, 25KAICIndustrial Type18 Branches 1.00 set13-20AT, 2P, 220V11-30AT, 2P, 220V19 MECB Rated 3AT, 2P, 230V, 50 AF with receptacleGround Type4.00 setV. MECHANICAL WORKS20 Split Type Air Conditioner 1.00 unit2 HP, 220 V, Single Phase, 60 Hz, complete withelectrical wirings, conduit pipes, NEMA enclosure,copper tubing insulation, PVC Drain, supports <strong>and</strong>hangers <strong>and</strong> others appurtenances ready for service21 Split Type Air Conditioner 2.00 unit1.5 HP, 220 V, Single Phase, 60 Hz, complete withelectrical wirings, conduit pipes, NEMA enclosure,copper tubing insulation, PVC Drain, supports <strong>and</strong>hangers <strong>and</strong> others appurtenances ready for service22 Cassette Type, Exhaust Ceiling Fan 3.00 unit0.02 KW, 220 V, Single Phase, 60 Hz, complete withfabrivated ducting to connect from the existingductwork, supports <strong>and</strong> hangers <strong>and</strong> othersappurtenances ready for servicesVI. GAS TANK HOUSEEarthworks23 Excavation 2.10 cu.m.24 Backfill 1.50 cu.m.25 Earthfill 2.00 cu.m.26 Gravefill 0.50 cu.m.Concrete Worksa. Concreting <strong>of</strong> Wall Footing, Slab <strong>and</strong> Ramp = 2.00cu.m. f'c = 3,200 psi @ 28 days81