11.07.2015 Views

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(v)Renewal <strong>of</strong> the effectivity dates <strong>of</strong> the performance securityafter its expiration during the course <strong>of</strong> contractimplementation.(c)(d)Assignment <strong>and</strong> subcontracting <strong>of</strong> the contract or any part there<strong>of</strong> orsubstitution <strong>of</strong> key personnel named in the proposal without priorwritten approval by the procuring entity.Poor performance by the contractor or unsatisfactory quality <strong>and</strong>/orprogress <strong>of</strong> work arising from his fault or negligence as reflected in theConstructor's Performance Evaluation System (“CPES”) rating sheet.In the absence <strong>of</strong> the CPES rating sheet, the existing performancemonitoring system <strong>of</strong> the procuring entity shall be applied. Any <strong>of</strong> thefollowing acts by the Contractor shall be construed as poorperformance:(i)(ii)Negative slippage <strong>of</strong> 15% <strong>and</strong> above within the critical path <strong>of</strong>the project due entirely to the fault or negligence <strong>of</strong> thecontractor; <strong>and</strong>Quality <strong>of</strong> materials <strong>and</strong> workmanship not complying with theapproved specifications arising from the contractor's fault ornegligence.(e)Willful or deliberate ab<strong>and</strong>onment or non-performance <strong>of</strong> the projector contract by the contractor resulting to substantial breach there<strong>of</strong>without lawful <strong>and</strong>/or just cause.In addition to the penalty <strong>of</strong> suspension, the performance security posted bythe contractor shall also be forfeited.20. Force Majeure, Release from Performance20.1. For purposes <strong>of</strong> this Contract the terms “force majeure” <strong>and</strong> “fortuitousevent” may be used interchangeably. In this regard, a fortuitous event orforce majeure shall be interpreted to mean an event which the Contractorcould not have foreseen, or which though foreseen, was inevitable. It shallnot include ordinary unfavorable weather conditions; <strong>and</strong> any other causethe effects <strong>of</strong> which could have been avoided with the exercise <strong>of</strong> reasonablediligence by the Contractor.20.2. If this Contract is discontinued by an outbreak <strong>of</strong> war or by any other evententirely outside the control <strong>of</strong> either the Procuring Entity or the Contractor,the Procuring Entity’s Representative shall certify that this Contract hasbeen discontinued. The Contractor shall make the Site safe <strong>and</strong> stop work asquickly as possible after receiving this certificate <strong>and</strong> shall be paid for allworks carried out before receiving it <strong>and</strong> for any Work carried outafterwards to which a commitment was made.60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!