11.07.2015 Views

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

18.5. When persons from either party to this Contract gives notice <strong>of</strong> afundamental breach to the Procuring Entity’s Representative in order toterminate the existing contract for a cause other than those listed under GCCClause 18.3, the Procuring Entity’s Representative shall decide whether thebreach is fundamental or not.18.6. If this Contract is terminated, the Contractor shall stop work immediately,make the Site safe <strong>and</strong> secure, <strong>and</strong> leave the Site as soon as reasonablypossible.19. Procedures for Termination <strong>of</strong> Contracts19.1. The following provisions shall govern the procedures for the termination <strong>of</strong>this Contract:(a)(b)Upon receipt <strong>of</strong> a written report <strong>of</strong> acts or causes which may constituteground(s) for termination as aforementioned, or upon its own initiative,the Procuring Entity shall, within a period <strong>of</strong> seven (7) calendar days,verify the existence <strong>of</strong> such ground(s) <strong>and</strong> cause the execution <strong>of</strong> aVerified Report, with all relevant evidence attached;Upon recommendation by the Procuring Entity, the Head <strong>of</strong> theProcuring Entity shall terminate this Contract only by a written noticeto the Contractor conveying the termination <strong>of</strong> this Contract. Thenotice shall state:(i)(ii)(iii)(iv)that this Contract is being terminated for any <strong>of</strong> the ground(s)afore-mentioned, <strong>and</strong> a statement <strong>of</strong> the acts that constitute theground(s) constituting the same;the extent <strong>of</strong> termination, whether in whole or in part;an instruction to the Contractor to show cause as to why thisContract should not be terminated; <strong>and</strong>special instructions <strong>of</strong> the Procuring Entity, if any.The Notice to Terminate shall be accompanied by a copy <strong>of</strong> theVerified Report;(c)(d)Within a period <strong>of</strong> seven (7) calendar days from receipt <strong>of</strong> the Notice<strong>of</strong> Termination, the Contractor shall submit to the Head <strong>of</strong> theProcuring Entity a verified position paper stating why the contractshould not be terminated. If the Contractor fails to show cause afterthe lapse <strong>of</strong> the seven (7) day period, either by inaction or by default,the Head <strong>of</strong> the Procuring Entity shall issue an order terminating thecontract;The Procuring Entity may, at anytime before receipt <strong>of</strong> the Bidder’sverified position paper described in item (c) above withdraw the Noticeto Terminate if it is determined that certain items or works subject <strong>of</strong>58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!