11.07.2015 Views

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

Improvement of FPA Laboratory - Fertilizer and Pesticide Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

32.3. Failure <strong>of</strong> the successful Bidder to comply with the above-mentionedrequirement shall constitute sufficient ground for the annulment <strong>of</strong> the award<strong>and</strong> forfeiture <strong>of</strong> the bid security, in which event the Procuring Entity shallinitiate <strong>and</strong> complete the post qualification <strong>of</strong> the second Lowest CalculatedBid. The procedure shall be repeated until the Lowest Calculated <strong>and</strong>Responsive Bid is identified <strong>and</strong> selected for contract award. However if noBidder passed post-qualification, the BAC shall declare the bidding a failure<strong>and</strong> conduct a re-bidding with re-advertisement.33. Notice to Proceed33.1. Within three (3) calendar days from the date <strong>of</strong> approval <strong>of</strong> the Contract bythe appropriate government approving authority, the Procuring Entity shallissue its Notice to Proceed to the Bidder.33.2. The contract effectivity date shall be provided in the Notice to Proceed bythe Procuring Entity, which date shall not be later than seven (7) calendardays from the issuance <strong>of</strong> the Notice to Proceed.36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!