<strong>The</strong> Next Step: 2Mtpa – 8 metre diameter SRV• Major Changes from 6m SRV– Hearth diameter increased from 6m to 8m– Production increased from 0.8 to 2.0 Mtpa– Redesigned hot air blast injection – improved process efficiency, simplermanufacture– Two 6m offgas hoods – single larger hood not feasible to manufacture, transport orerect• Minimal Changes to:– Lances– Forehearth– Cooling Panels– RefractoryOffgasChamberOffgas DuctsRoofForehearth© HIsmelt Corporation 20088m SRVSRV Access6m SRV8 metre v. 6 metre SRV: Low technical riskOffgas ChamberOffgas DuctsRoofFore Hearth8m SRVSRV Access6m SRV© HIsmelt Corporation 200818