11.07.2015 Views

2006-2007 Annual Report - Santa Rosa County

2006-2007 Annual Report - Santa Rosa County

2006-2007 Annual Report - Santa Rosa County

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Engineering DepartmentThe <strong>County</strong> Engineering Department is comprised of three departments:engineering, environmental and Navarre Beach utilities.EngineeringThe engineering department provides technical support to all countyoperations and departments. Services include engineering planning, surveying,environmental and regulatory permitting, design and construction documentpreparation, and inspection for multiple county projects involving stormwatermanagement, traffic management and control systems, roadway improvements,airport infrastructure, hazard mitigation, county owned water & wastewatersystems and industrial park infrastructure improvements. Additionally, allcommercial site plans and subdivision developments are reviewed to determinepotable water, and wastewater concurrency and compliance with the county’sstormwater requirements with the land development code. The departmentreviews four submittal phases -preliminary plat, construction plans, final plat,paved road and drainage maintenance of subdivision developments and makesrecommendations to the board of county commissioners for each phase of development.Fiscal Year <strong>2006</strong>/<strong>2007</strong> Highlights• Fox Den Drive – Extended the east and west bound left turn lanes.• Panhandle Trail – Extended the west bound left turn lane.• Breezy Wind Drive - Designed a directional median opening, extended the east andwest bound left turn lanes.• Paloma Street – Extended the east and west bound left turn lanes, modified drainage.• Central Parkway - Designed a directional median opening, extended east and westbound left turn lanes.• Bay Shore Road - Realigned the existing roadway and added a right turn lane.• Soundside Drive - Constructed a right turn lane.• Nantahala Beach Road -Constructed a right turn lane.• East Bay Blvd. - Constructed aright turn lane.• Medians 1-5 on the EscambiaFill - median crossover’s 1and 3 were removed due tolack of use with medians 2, 4, and5 reconstructed to becomedirectional with the addition ofturn lanes.• Median improvement design forAnna Simpson Road, Van Horn Road,Red Barn BBQ, Galilee BaptistChurch, <strong>Santa</strong> Villa DriveParkmore Plaza, Kia dealer,Ford dealer, and Goodyear store.Construction will begin in early 2008.Roger Blaylock, PE<strong>County</strong> Engineer6051 Old Bagdad Hwy.Suite 300Milton, FL 32583(850) 981-7100 Office(850) 983-2161 Faxrogerb@santarosa.fl.govOpportunity Drive extension in the <strong>Santa</strong> <strong>Rosa</strong> <strong>County</strong>Industrial Park.25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!