Quarterly September 2007 - Odfjell

Quarterly September 2007 - Odfjell Quarterly September 2007 - Odfjell

11.07.2015 Views

The Korea class goes double-hullDry-docking and double-hull conversion of Bow PioneerBy Geirmund DrivenesM/T Bow Pioneerwas delivered fromthe shipyard in Koreain May 1982, andearly this summershe was due for herfifth class renewal.In connection withthis scheduled drydocking,we alsoplanned a conversion of four cargotanksto meet the MARPOL double-hullrequirements; cargo-tanks 1 and 12, SB& P. The principle of the conversion isto introduce a longitudinal bulkhead inthe tank with a minimum distance fromthe ship side of 760 mm. By doing theconversion, the ship would no longer besubject to IMO’s single-hull phase outrules and would be allowed to load easygrade Annex I cargoes.The conversion engineering was carriedout by Bergen-based SkipskonsulentAS, in cooperation with Odfjell’ssuperintendent and Det Norske Veritas.The main challenge was to locatethe longitudinal bulkhead efficiently,minimising added steel weight, retainingsufficient strength and at the sametime avoid “stealing” too much volumefrom the cargo tanks. The chosen solutioncomprises these three challengesby situating the longitudinal bulkheadat no place closer than 1,000 mm fromthe ship side with a total weight addedof approximately 110 tonnes and witha total “lost” cargovolume of about800 cbm. The newspaces in the ship’sside are dry voidspaces, planned forneither cargo norballast.COSCO Nantongshipyard hasthrough the lastcouple of years carriedout doublehullconversionsof many ships andfor many owners,to help them avoidtrading restrictionscaused by IMO’ssingle-hull phase out rules. For Odfjellall five KSEC class ships were convertedfrom April until December 2006 withsuccessful results.Bow Pioneer arrived at COSCO Nantongon June 11th and the entire projectincluding dry-docking and repairs,class renewal and the conversion wascompleted by August 12. The projectwas initially planned completed muchquicker, however, due to an extremelyhot summer in China, governmentalrestrictions imposed a complete stopin the activities at the yard as soon astemperature exceeded 36 degrees Celsius.This caused a lot of time during theThe access hole that was cut in the deck to insert the steelpanels for the longitudinal bulkhead in cargo-tank 12 SBnormally busiest part of the day to passby without any real progress.In addition to the conversion, the shipshad its CAP rating renewed at level 2,by replacing approximately 35 tonnesof steel. Other steel jobs of significancewere the replacement of parts of thefore and aft stainless steel bulkheadin cargo tank 6C, to repair damagesdone during cargo operations last winter.Other main items on the repair listwere cleaning/sweeping and paintingof the ship’s side and bottom, a majoroverhaul of the main engine, significantrepairs and overhaul of the FRAMOcargo pumping system, boiler repairs,recoating of cargo tanks, in particularsthose subject to conversion, in additionto minor coating repairs in a few of theballast tanks.The newly painted Bow Pioneer in dry-dockThe four sister ships sailing in a pool,Bow Pioneer, Bow Hunter, NCC Arar andNCC Asir, will all go through the sameconversion. The NCC ships have recentlyfollowed and the conversion projectwill be completed by Bow Hunter, whois planned to arrive at the repair yard inNantong by mid October. The superintendentfor the Bow Pioneer conversion,Ole Abrahamsen, will also supervise themodification of Bow Hunter and thus,he will be well prepared for the challengesthat meet him when Bow Huntercalls Nantong for her repairs and conversion.24 Odfjell Quarterly September 2007

By Toralf SørenesEnclosed SpacesEnclosed spaces have two main risk factors;lack of oxygen, and presence offlammable gases that again can lead topersonal injuries or fatalities and fire orexplosions. Since our last Safety Bulletinboth scenarios have unfortunately materializedon ships used by Odfjell.Safety BulletinIn the November 2006 Safety Bulletinwe wrote about the dangers of N 2 inenclosed spaces. For our operations thisis mainly cargo tanks. Our 2006 articlewas triggered by a senior officer thatlost his life because he entered a tankthat was N 2 inerted. The ship was neitherowned nor managed by Odfjell,but she was commercially operated byOdfjell Seachem (OS). In August thisyear we had a very similar accident: asenior officer entered a tank that wasN 2 inerted and lost his life. Again, theship was commercially operated by OS,but neither owned nor managed byOdfjell. Other common denominatorswere, however, also noted. Both the deceasedwere experienced senior officersand, amongst other duties, in charge ofissuing tank entry permissions. Neitherof them used personal gas meters andboth were obviously JUST going intothe tank to fix/fetch or check something.By-standing crew did not intervene,possibly because a senior officerwas involved. We have said it manytimes before and will continue to repeatthe message, never by-pass or short-cutprocedures and checklists in this area. Atypical example is that something is lostor gets entangled on the first ladderplatform and one just enters becauseit is so close, both in distance and timeneeded.N 2 is very dangerous because of oxygendepletion in combination with anShip Security & PerformanceAt Risk Management we are presentlyin the process of updating our Ship SecurityPlan (SSP). This is a yearly processthat follows the annual review of theSSP made by the ships. We hope to completethis updating by mid October andwill take this opportunity to thank theships for valuable inputs. These structuredinputs from those out there in thefield will greatly assist us in making theanaesthetic effect. If exposed to it, onewill normally not fully understand whathappens and therefore not be able toact in a rational manner. In both casesthe officer who entered the tank encounteredproblems very quickly, lostconsciousness and fell to a platform. Theassisting crew raised alarm, evacuationwas initiated and the person broughtup on deck and first aid including administrationof oxygen was given. Thisoperation was done very quickly by welltrained crew, but unfortunately it wastoo late to save the persons life. Theabove examples are sad and show thattank entry procedures are not somethingto play around with. You may endup not getting a second chance andthere is no difference between ranksand seniority.The other accident involved hot work ina tank during a stay at a repair yard. Theship was owned and managed by Odfjelland had been at the yard for sometime when the accident occurred. Gasfree certificates had been issued bothfor the complete ship during pre-arrivalchecking and later on daily basis priorSSP slimmer, more user-friendly, and lastbut not least, a good and active instrumentfor making our ships and operationssafe and secure.In February 2006 we distributed ourfirst performance report at Ship Managementdepartment (SMD). These reportsare closely connected to our KPIs.They are distributed on quarterly basisto commencement of work. At normalday hours a small fire occurred ina tank. No damage of any significancewas noted, but a safety team from theyard attended to investigate. Shortlyafter their arrival on the site, a secondand stronger fire occurred and a personfrom the attending team was seriouslyburned and later passed away. The lessonlearned is that a chemical tanker iscomplex both with regard to constructionand cargoes, and a gas free certificateis only a piece of paper. Thereis always a possibility that flammablecargoes could be trapped somewherein blind ends on lines, low points, drainchocksor that oxygen/gas can leakfrom equipment used by the yard. In anenclosed space this may result in flammablegases/mixtures accumulatinginto a level that is dangerous. It is thereforevery important to maintain safetyawareness throughout the dry-dockingand to measure gas levels on a regularbasis. Smaller fires or “puffing” say thatsomething is wrong and all work mustbe stopped until the causes have beenfound and eliminated.and have continuously been expandedand improved. A few issues will, however,still need further refinement. Thereport is an important instrument ingetting a picture of where SMD standon important issues. This will help us toidentify areas that need particular focusand later to see if this focus has had thedesired effect.Odfjell Quarterly September 2007 25

The Korea class goes double-hullDry-docking and double-hull conversion of Bow PioneerBy Geirmund DrivenesM/T Bow Pioneerwas delivered fromthe shipyard in Koreain May 1982, andearly this summershe was due for herfifth class renewal.In connection withthis scheduled drydocking,we alsoplanned a conversion of four cargotanksto meet the MARPOL double-hullrequirements; cargo-tanks 1 and 12, SB& P. The principle of the conversion isto introduce a longitudinal bulkhead inthe tank with a minimum distance fromthe ship side of 760 mm. By doing theconversion, the ship would no longer besubject to IMO’s single-hull phase outrules and would be allowed to load easygrade Annex I cargoes.The conversion engineering was carriedout by Bergen-based SkipskonsulentAS, in cooperation with <strong>Odfjell</strong>’ssuperintendent and Det Norske Veritas.The main challenge was to locatethe longitudinal bulkhead efficiently,minimising added steel weight, retainingsufficient strength and at the sametime avoid “stealing” too much volumefrom the cargo tanks. The chosen solutioncomprises these three challengesby situating the longitudinal bulkheadat no place closer than 1,000 mm fromthe ship side with a total weight addedof approximately 110 tonnes and witha total “lost” cargovolume of about800 cbm. The newspaces in the ship’sside are dry voidspaces, planned forneither cargo norballast.COSCO Nantongshipyard hasthrough the lastcouple of years carriedout doublehullconversionsof many ships andfor many owners,to help them avoidtrading restrictionscaused by IMO’ssingle-hull phase out rules. For <strong>Odfjell</strong>all five KSEC class ships were convertedfrom April until December 2006 withsuccessful results.Bow Pioneer arrived at COSCO Nantongon June 11th and the entire projectincluding dry-docking and repairs,class renewal and the conversion wascompleted by August 12. The projectwas initially planned completed muchquicker, however, due to an extremelyhot summer in China, governmentalrestrictions imposed a complete stopin the activities at the yard as soon astemperature exceeded 36 degrees Celsius.This caused a lot of time during theThe access hole that was cut in the deck to insert the steelpanels for the longitudinal bulkhead in cargo-tank 12 SBnormally busiest part of the day to passby without any real progress.In addition to the conversion, the shipshad its CAP rating renewed at level 2,by replacing approximately 35 tonnesof steel. Other steel jobs of significancewere the replacement of parts of thefore and aft stainless steel bulkheadin cargo tank 6C, to repair damagesdone during cargo operations last winter.Other main items on the repair listwere cleaning/sweeping and paintingof the ship’s side and bottom, a majoroverhaul of the main engine, significantrepairs and overhaul of the FRAMOcargo pumping system, boiler repairs,recoating of cargo tanks, in particularsthose subject to conversion, in additionto minor coating repairs in a few of theballast tanks.The newly painted Bow Pioneer in dry-dockThe four sister ships sailing in a pool,Bow Pioneer, Bow Hunter, NCC Arar andNCC Asir, will all go through the sameconversion. The NCC ships have recentlyfollowed and the conversion projectwill be completed by Bow Hunter, whois planned to arrive at the repair yard inNantong by mid October. The superintendentfor the Bow Pioneer conversion,Ole Abrahamsen, will also supervise themodification of Bow Hunter and thus,he will be well prepared for the challengesthat meet him when Bow Huntercalls Nantong for her repairs and conversion.24 <strong>Odfjell</strong> <strong>Quarterly</strong> <strong>September</strong> <strong>2007</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!