11.07.2015 Views

Quarterly September 2007 - Odfjell

Quarterly September 2007 - Odfjell

Quarterly September 2007 - Odfjell

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bamboo rising to the skyExpansion at <strong>Odfjell</strong> Terminals (Korea)By Sang Ki Lee, Maintenance Manager and Project Manager, OTKThe expansion at<strong>Odfjell</strong> Terminals(Korea) is underfull construction,and new tanks aregrowing up almostlike bambooshoots. During theperiod from end ofJune till early Augustwe had very unfavourable weatherconditions in Korea. Heavy rainfall forweeks obstructed our contractor DEC(Daewoo Engineering Company) towork with heavy machines in the mud.The rain was followed by extremelyhot temperatures, daily round 36-39˚C.During tank erection work, the steelaccumulated the solar energy to causetemperatures round 50˚C inside the halfconstructedtanks. To protect the constructionworkers against over-heatingwe implemented tropical work schedules(05:00 am - 3:00 pm) and regular“shower breaks” after 40 minutes work.In addition we rescheduled some itemsin our master plan and relocated part ofthe workforce to tasks such as concretework for buildings and pipe-racks.Despite the obstacles we have so faronly had a ten days delay of the wholeconstruction project, which should bepossible to catch up before the end ofthis year.PIT 8, with five tanksIntegrating New Pipeline Systems into the existing truckloading area with 14 racks39˚C - it’s hot but still going strong. Stainless steel roofs just infront of their tanksExtension of the office Building and new location for <strong>Odfjell</strong>Shipping on the terminal per mid October22 <strong>Odfjell</strong> <strong>Quarterly</strong> <strong>September</strong> <strong>2007</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!