24.11.2012 Views

Toll Today March 2011 - TOLL Group

Toll Today March 2011 - TOLL Group

Toll Today March 2011 - TOLL Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Global Express<br />

<strong>Toll</strong> IPEC Opens New<br />

A$46 Million Logistics<br />

22<br />

<strong>TOLL</strong> IPEC OFFICIALLy CELEBrATED THE oPEninG OF ITS NEWEST FREiGHT HanDLinG FaCiLiTy AT<br />

THE STaTE-oF-THE-aRT CEnTRE WAS OFFICIALLy OPENED By COuNCILLOr CHaRLiE Zannino, MAyOr<br />

1 L-R: Councillor<br />

Charlie Zannino being<br />

shown the new facility<br />

by <strong>Toll</strong> IPEC’s GM<br />

Rodney Johnston.<br />

2 The new reception<br />

at Hazelmere.<br />

3 The official opening<br />

of the site. L-R:<br />

Kenton Muller,<br />

Rodney Johnston,<br />

Councillor Charlie<br />

Zannino and<br />

Shane O’Neill.<br />

4 A panoramic view<br />

of the new depot.<br />

The new 5.4 hectare site at<br />

Hazelmere showcases the latest<br />

in freight distribution technology<br />

and infrastructure. It consolidates <strong>Toll</strong><br />

IPEC’s former Forrestfield facility and<br />

the Courier Australia operations<br />

bringing 430 employees under one roof.<br />

<strong>Toll</strong> IPEC’s new Hazelmere depot<br />

follows the commissioning of a similar<br />

facility in the Brisbane suburb of<br />

Larapinta, opened in February 2010.<br />

The new Perth depot located in one<br />

of the city’s fastest growing industrial<br />

suburbs, continues an ongoing<br />

upgrade of network facilities to ensure<br />

improved productivity and enhanced<br />

service at <strong>Toll</strong> IPEC.<br />

The new facility is designed to handle<br />

a range of freight types including,<br />

hanging fashion garments, fragile<br />

and sensitive freight, overnight priority<br />

and express road freight. It includes<br />

six dock levellers for rear end loading<br />

and unloading, plus space to handle<br />

a large number of side load trailers.<br />

In total the site is designed to process<br />

up to 60 B-doubles a day.<br />

During the official opening, Divisional<br />

Director, Shane o’neill said, “It is less<br />

than 10 years since <strong>Toll</strong> IPEC built its<br />

previous depot in Forrestfield. Over that<br />

period <strong>Toll</strong> IPEC has expanded rapidly<br />

1<br />

and its new depot in Hazelmere is<br />

a clear reflection of both <strong>Toll</strong> IPEC’s<br />

success and overall economic<br />

growth achieved in WA.<br />

2<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!