'11 • SCM-DB-109Delete- 235 -
7.5 Superlink E board (SC-ADNA-E) PJZ012D029F FRead and understand the instructions completely before starting installation.Refer to the instructions for both indoor and outdoor units.'11 • SCM-DB-109Safety precautions” group also may lead to serious results under certain conditions. Both groups are crucial for safety installation. Read and understand them carefully.WarningCautionProvide ground connection.The ground line should never be connected to the gas supply piping, the watercustomer, it may result in electric shock or fire.supply piping, the lightning conductor rod, nor the telephone ground. If thegrounding is improper, it may result in electric shock.Do not install the device in the following locations.1.Where there is mist/spray of oil or steam such as kitchens.2.Where there is corrosive gases such as sulfurous acid gas.3.Where there is a device generating electromagnetic waves.These may interfere with the control system resulting in the device becominguncontrollable.4.Where flammable volatile materials such as paint thinner and gasolinemay exist or where they are handled. This may cause a fire.1 Application 5 Connection OutlineIndoor-to-outdoor three core communication specification type 3 (sinceNote for setting the addressOctober 2007)Set the address between 00 and 47 for the previous Super Link connectionand between 000 and 127 for the new Super Link connection. (*1)2 AccessoriesDo not set the address overlapping with those of the other devices in thenetwork. (The default is 000)SL E board Metal box Metal cover Screw for GroundM4×8L 2 piecesPan head screws Locking supports Binding band GrommetTo secure theprint board and4×8L 2 pieces the metal boxMade of nylon4 pieces(*1) Whether the actual link is either the new Super Link or the previous SuperLink depends on the models of the connected outdoor and indoor units.Consult the agent or the dealer.3 FunctionAllowing the center console SL1N-E, SL2NA-E, and SL3N-AE/BE to controland monitor the commercial air conditioning unit.4 Control switchingSignal line specificationCommunication method Previous Super Link New Super LinkSettings can be changed by the switch SW3 on the SL E board as in the following.Line type MVVS MVVSLine diameter 0.75 - 1.25mm 2 0.75/1.25mm 2Switch Symbol SwitchRemarksSignal line (total length) up to 1000m up to 1500/1000m (*2)1ONMasterSignal line (maximum length) up to 1000m up to 1000mOFF (default) SlaveONFixed previous protocol(*2) Up to 1500 m for 0.75 mm 2 , and up to 1000 m for 1.25 mm 2 .2Do not use 2.0 mm 2 . It may cause an error.OFF (default) Automatic adjustment of Super Link(*3) Connect grounding on both ends of the shielding wire.protocolFor the grounding method, refer to the section “ 6 Installation”.SW3ONIndicates the forced operation stopwhen abnormality has occurred.3OFF (default) Indicates the status of running/stop asit is, when abnormality has occurred.ONThe hundredth address activated “1”4OFF (default) The hundredth address activated “0”Carefully read “Safety precautions” first. Follow the instructions for installation.Precautions are grouped into “Warning ” and “Caution ”. The “Warning ” group includes items that may lead to serious injury or death if not observed. The items includedin the “CautionAfter installation, conduct the test operation of the device to check for any abnormalities. Describe how to operate the device to the customer following the installation instructionmanual, Instruct the customer to keep this installation instruction for future reference.This device should be installed by the dealer where you purchase the deviceor a licensed professional shop. If the device is incorrectly installed by the Install the device carefully following the installation instruction. If the device isincorrectly installed, it may result in electric shock or fire. Use the accessory parts and specified parts for installation. If any parts that donot match the specifications are used, it may result in electric shock or fire. A person with the electrical service certification should conduct the servicebased on the “Technical standards for electrical facilities”, “Electrical WiringCode”, and the installation instruction. If the work is done incorrectly, it mayresult in electric shock or fire. Wiring should be securely connected using the specified types of wire. Noexternal force on the wire should be applied to any terminals. If a secureconnection is not achieved, it may result in electric shock or fire.
- Page 185 and 186: Indoor unitcombination4room5roomRoo
- Page 187 and 188: Indoor unitcombination6roomRoom coo
- Page 189 and 190: Indoor unitcombination4roomRoom hea
- Page 191 and 192: Indoor unitcombination5room6roomRoo
- Page 193 and 194: Indoor unitcombination1room2room3ro
- Page 195 and 196: Indoor unitcombination4roomRoom coo
- Page 197 and 198: Indoor unitcombination5room6roomCoo
- Page 199 and 200: Indoor unitcombination1room2room3ro
- Page 201 and 202: Indoor unitcombination4roomRoom hea
- Page 203 and 204: Indoor unitcombination5room6roomRoo
- Page 205 and 206: '11 • SCM-DB-1096. SELECTION CHAR
- Page 207 and 208: te controllerly unexpected stress o
- Page 209 and 210: The functional settingThe initial f
- Page 211 and 212: y defined as following table.it.flo
- Page 213 and 214: ote controllerto apply unexpected s
- Page 215 and 216: '11 • SCM-DB-109The functional se
- Page 217 and 218: s automatically defined as followin
- Page 219 and 220: Remote controllerInstallation of th
- Page 221 and 222: 3 '11 • SCM-DB-109
- Page 223 and 224: 3 4 '11 • SCM-DB-109 - 222 -
- Page 225 and 226: '11 • SCM-DB-1094 Remotecontrolle
- Page 227 and 228: Remote control installation dimensi
- Page 229 and 230: - 228 - How to set functions by but
- Page 231 and 232: failure.2 cores× 2 cores× 2 cores
- Page 233 and 234: '11 • SCM-DB-109Installation of t
- Page 235: '11 • SCM-DB-109Connection of wir
- Page 239 and 240: 7.6 Ducted type (SRRM) optional par
- Page 241 and 242: Air flow and external static pressu
- Page 243 and 244: 4) Use hard PVC general purpose pip
- Page 245 and 246: - 239 - PJZ012D076'11 • SCM-DB-10
'11 • SCM-DB-109Delete- 235 -