5.5 Material Storage and HandlingContractors and their subcontractors will be expected tomaintain a tidy t Site andd to operate a “just intime “policy for the delivery and supply of materials for the works, particularly the final phase of theworks when on Site storage will be at a minimum;Materials are to be stored on Site to minimise damage by vehicles, vandals, weather or theft;Tanks and drums of liquid chemicals and fuels would be stored in secure compounds. Packaging wouldbe returned, where possible. Deliveries of potentially hazardous materials wouldd be supervised and ajust‐in‐time deliveries system would be implemented to minimise storage times and reduce the t risk ofspillage on the Site.Tower cranes will beused for general unloading and hoisting during the structural and envelope works.Where unloading in the pit lane is required provisions will be made with w <strong>Southwark</strong> <strong>Council</strong>, the Police;and TfLPassenger/Goods materials hoists will be used to hoist materials to the floors, and fork lift trucks andother electric or hydraulically operated plantt will be usedto distribute and transport materials aroundthe Site.5.6 Visitor <strong>Management</strong>• Visitors will only be allowed to enter the Site via designated pedestrian accesss gates and a dedicatedsegregated footpath to the main Site offices for registration and obtaining o PPE prior to entering theSite;St Mary’s Residential Detailed <strong>Plan</strong>ning Application May 201217

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!