11.07.2015 Views

INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...

INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...

INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru <strong>2200</strong> Aircraft EngineHydraulic Valve Lifter Models10.3 Run-In Checks1. PreliminaryPaperwork CompleteSufficient FuelCorrect Oil LevelAll Connections Correct and Secure2. Start RunStart Time _____________End Time _____________3. Ignition Checks (repeat a couple of times for each side)Left Side1000/2000 rpmRight Side 1000/2000 rpm4. Oil LeaksCheck Visually5. InstrumentsWorking and Correct Range6. IdleCheck idle screw (3/4 to 1 turn out)7. General RunningSmoothnessNoisesManifold Sealing8. Oil Pressure and Temp9. Check Ignition light to Tacho Test Rig (Top End RPM)10. Check alternator Charging Voltage10.4 Jabiru <strong>2200</strong> – Engine Post Run Procedure1. Heads retorqued 32 Nm (24 ft/lb). Valves Adjusted.2. Check induction/exhaust bolts.3. Any changes to be made.4. Rerun, check for oil leaks and/or any modificationsmade (oil pressure/leaks etc).5. Check charging rate of alternator Volts6. Leak Down80 80 80 80Cyl 1 2 3 4SIGNDATE7. Check all paper work8. Drain fuel/oil. Prepare for Shipment.This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 97 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!