INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...
INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ... INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...
Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru 2200 Aircraft EngineHydraulic Valve Lifter Models9.14 Subassembly H – Component Assembly ProcedureFinal AssemblyNo. Details Sign Sign DateH1 Apply Loctite 515 to crankcase halves;lubricate where necessaryH2 Locate camshaft and crankshaft incrankcase halfStage Stage Inspection Pre-joining Crankcase3H3 Locate crankcase half over crankshaft andcamshaftH4 Tension front (2) and rear (2) studsH5 Fit oil pump assembly and front sealhousingH6 Place all through bolts in crankcaseH7 Fit piston and cylinder assemblies andcheck circlipsStage Stage Inspection Piston/Circlips4H8 Tension the cylinder base studs to 25 ft.lbsthen 30 ft.lbsH9 Fit sumpH10 Fit heads to cylinder torque 12 ft.lbs / 24ft.lbsH11 Fit push rod and valve gear. Set gap to0.10” (0.25mm)H12 Check camshaft timing DEGREESH13 Fit fuel pumpH14 Fit engine mount plate and gearboxhousingH15 Fit flywheel alternator mount plate andignition coils and leadH16 Fit carby assemblyH17 Fit exhaust systemI hereby certify that the subassembly has been completed using the approved proceduresand data; and is fit for installation.Signed: _______________Date: ____________For Jabiru Aircraft Pty LtdProduction Certificate #444128Notes:This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 94 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx
Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru 2200 Aircraft EngineHydraulic Valve Lifter Models10 Jabiru 2200 Engine Run-In & Testing10.1 Run-In ScheduleFigure 40. Drawing 9486091 – Run-In ScheduleThis document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 95 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx
- Page 43 and 44: Jabiru Aircraft Pty LtdInstruction
- Page 45 and 46: Jabiru Aircraft Pty LtdInstruction
- Page 47 and 48: Jabiru Aircraft Pty LtdInstruction
- Page 49 and 50: Jabiru Aircraft Pty LtdInstruction
- Page 51 and 52: Jabiru Aircraft Pty LtdInstruction
- Page 53 and 54: Jabiru Aircraft Pty LtdInstruction
- Page 55 and 56: Jabiru Aircraft Pty LtdInstruction
- Page 57 and 58: Jabiru Aircraft Pty LtdInstruction
- Page 59 and 60: Jabiru Aircraft Pty LtdInstruction
- Page 61 and 62: Jabiru Aircraft Pty LtdInstruction
- Page 63 and 64: Jabiru Aircraft Pty LtdInstruction
- Page 65 and 66: Jabiru Aircraft Pty LtdInstruction
- Page 67 and 68: Jabiru Aircraft Pty LtdInstruction
- Page 69 and 70: Jabiru Aircraft Pty LtdInstruction
- Page 71 and 72: Jabiru Aircraft Pty LtdInstruction
- Page 73 and 74: Jabiru Aircraft Pty LtdInstruction
- Page 75 and 76: Jabiru Aircraft Pty LtdInstruction
- Page 77 and 78: Jabiru Aircraft Pty LtdInstruction
- Page 79 and 80: Jabiru Aircraft Pty LtdInstruction
- Page 81 and 82: Jabiru Aircraft Pty LtdInstruction
- Page 83 and 84: Jabiru Aircraft Pty LtdInstruction
- Page 85 and 86: Jabiru Aircraft Pty LtdInstruction
- Page 87 and 88: Jabiru Aircraft Pty LtdInstruction
- Page 89 and 90: Jabiru Aircraft Pty LtdInstruction
- Page 91 and 92: Jabiru Aircraft Pty LtdInstruction
- Page 93: Jabiru Aircraft Pty LtdInstruction
- Page 97 and 98: Jabiru Aircraft Pty LtdInstruction
- Page 99 and 100: Jabiru Aircraft Pty LtdInstruction
- Page 101 and 102: Jabiru Aircraft Pty LtdInstruction
- Page 103 and 104: Jabiru Aircraft Pty LtdInstruction
- Page 105 and 106: Jabiru Aircraft Pty LtdInstruction
- Page 107 and 108: Jabiru Aircraft Pty LtdInstruction
- Page 109 and 110: Jabiru Aircraft Pty LtdInstruction
- Page 111 and 112: Jabiru Aircraft Pty LtdInstruction
- Page 113 and 114: Jabiru Aircraft Pty LtdInstruction
- Page 115 and 116: Jabiru Aircraft Pty LtdInstruction
Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru <strong>2200</strong> Aircraft EngineHydraulic Valve Lifter Models9.14 Subassembly H – Component Assembly ProcedureFinal AssemblyNo. Details Sign Sign DateH1 Apply Loctite 515 to crankcase halves;lubricate where necessaryH2 Locate camshaft and crankshaft incrankcase halfStage Stage Inspection Pre-joining Crankcase3H3 Locate crankcase half over crankshaft andcamshaftH4 Tension front (2) and rear (2) studsH5 Fit oil pump assembly and front sealhousingH6 Place all through bolts in crankcaseH7 Fit piston and cylinder assemblies andcheck circlipsStage Stage Inspection Piston/Circlips4H8 Tension the cylinder base studs to 25 ft.lbsthen 30 ft.lbsH9 Fit sumpH10 Fit heads to cylinder torque 12 ft.lbs / 24ft.lbsH11 Fit push rod and valve gear. Set gap to0.10” (0.25mm)H12 Check camshaft timing DEGREESH13 Fit fuel pumpH14 Fit engine mount plate and gearboxhousingH15 Fit flywheel alternator mount plate andignition coils and leadH16 Fit carby assemblyH17 Fit exhaust systemI hereby certify that the subassembly has been completed using the approved proceduresand data; and is fit for installation.Signed: _______________Date: ____________For Jabiru Aircraft Pty LtdProduction Certificate #444128Notes:This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 94 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx