11.07.2015 Views

INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...

INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...

INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru <strong>2200</strong> Aircraft EngineHydraulic Valve Lifter ModelsNo. Operation Tools Required23 Start and inspect for leaks -24 Test FlyNote: First flight is a test flight so flyconservatively25 Remove Cowls and inspect for anything loose,rubbing or leaking.--26 Check Head bolt tensions torqued to 20 ft. lb. -27 At25 hours inspect engine installation. Changeoil and filter. Cut filter open and inspect. Checkengine leak down28 If oil consumption is stable fill with W100 (W80in cold conditions and W120 in very hotconditions). If it is still using oil remain on runin oil or seek advice from Jabiru Aircraft or localauthorized representative--7.7 Prop Strike InspectionAfter ground contact with the propeller, check the crankshaft and prop flange for run outas shown below.Figure 38 Dial Indicator Position for Crankshaft & Prop Flange Run OutRemove one spark plug from each head.This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 76 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!