INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...
INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ... INSTRUCTION AND MAINTENANCE MANUAL FOR JABIRU 2200 ...
Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru 2200 Aircraft EngineHydraulic Valve Lifter ModelsC51. Disassemble and clean off all carbon.2. Inspect rocker tip for wear. Replace any with excessive wear.3. Measure bushes and record on build sheet.4. If over service limits, replace.Figure 19. Drawing 9449064 – Rocker Bush Removal1. Clean off old Loctite from rocker bore.2. Press in Bushes.Note - The width of the bushes is critical for the correct amount of end float, sothey must be pushed right home.Figure 20. Drawing 9A011A0D – Rocker Shaft Install1. Put capscrew through clamp hole and check rocker end float. Must be 0.1to 0.4mm (0.004" to 0.010").2. Clean up, oil well and reassemble.CylindersThis document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 52 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx
Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru 2200 Aircraft EngineHydraulic Valve Lifter ModelsC61. Clean and visually inspect2. Mount cylinders in honing machine by base and hone with Sunnen mm 33-J85 Stone3. Measure and record in Build Sheet4. Bead blast cylinder outer to remove all old paint and rust.5. Etch prime and paint with high temperature paint.6. Run 5/16 UNF Tap through head threads to remove all beads and to insurethat head bolts torque up fully.7. Clean in kerosene then in hot soapy water to remove all honing oil etc.Note: Once cleaned, oil up cylinders straight away. Store in a cool dry place in asealed container.Figure 21. Drawing 9436064 – Barrel HoneC7C8Pistons1. Clean oil out of pistons2. Dip Pistons in cold dip solvent (i.e. Redik DKT degreaser – decarboniserpaint stripper) as per manufacturers instructions to remove all carbon.Note: The head of the piston can be bead blasted, but never bead blast the ringgrooves, piston skirt and piston pin bores.3. Use an old ring to clean carbon out of ring grooves but care must be takennot to scratch grooves. Any scratching will cause Gas Leakage past therings. A piece of 2mm (0.080") perspex can also be used as it is kinder tothe pistons.1. Clean thoroughly.2. Visually inspect pistons for cracks or damage.3. Measure pistons and record in build sheet.4. Check circlip groove.NOTE: Top ring has uninterrupted vertical edge. 2 nd Ring has 2 cut-aways onvertical face (Top and Bottom). Ring manufacturers will specify machinings andorientation of first and second rings.This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 53 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx
- Page 1 and 2: INSTRUCTION AND MAINTENANCE MANUALF
- Page 3 and 4: Jabiru Aircraft Pty LtdInstruction
- Page 5 and 6: Jabiru Aircraft Pty LtdInstruction
- Page 7 and 8: Jabiru Aircraft Pty LtdInstruction
- Page 9 and 10: Jabiru Aircraft Pty LtdInstruction
- Page 11 and 12: Jabiru Aircraft Pty LtdInstruction
- Page 13 and 14: Jabiru Aircraft Pty LtdInstruction
- Page 15 and 16: Jabiru Aircraft Pty LtdInstruction
- Page 17 and 18: kWkWNmNmJabiru Aircraft Pty LtdInst
- Page 19 and 20: Jabiru Aircraft Pty LtdInstruction
- Page 21 and 22: Jabiru Aircraft Pty LtdInstruction
- Page 23 and 24: Jabiru Aircraft Pty LtdInstruction
- Page 27 and 28: Jabiru Aircraft Pty LtdInstruction
- Page 29 and 30: Jabiru Aircraft Pty LtdInstruction
- Page 31 and 32: Jabiru Aircraft Pty LtdInstruction
- Page 33 and 34: Jabiru Aircraft Pty LtdInstruction
- Page 35 and 36: Jabiru Aircraft Pty LtdInstruction
- Page 37 and 38: Jabiru Aircraft Pty LtdInstruction
- Page 39 and 40: Jabiru Aircraft Pty LtdInstruction
- Page 41 and 42: Jabiru Aircraft Pty LtdInstruction
- Page 43 and 44: Jabiru Aircraft Pty LtdInstruction
- Page 45 and 46: Jabiru Aircraft Pty LtdInstruction
- Page 47 and 48: Jabiru Aircraft Pty LtdInstruction
- Page 49 and 50: Jabiru Aircraft Pty LtdInstruction
- Page 51: Jabiru Aircraft Pty LtdInstruction
- Page 55 and 56: Jabiru Aircraft Pty LtdInstruction
- Page 57 and 58: Jabiru Aircraft Pty LtdInstruction
- Page 59 and 60: Jabiru Aircraft Pty LtdInstruction
- Page 61 and 62: Jabiru Aircraft Pty LtdInstruction
- Page 63 and 64: Jabiru Aircraft Pty LtdInstruction
- Page 65 and 66: Jabiru Aircraft Pty LtdInstruction
- Page 67 and 68: Jabiru Aircraft Pty LtdInstruction
- Page 69 and 70: Jabiru Aircraft Pty LtdInstruction
- Page 71 and 72: Jabiru Aircraft Pty LtdInstruction
- Page 73 and 74: Jabiru Aircraft Pty LtdInstruction
- Page 75 and 76: Jabiru Aircraft Pty LtdInstruction
- Page 77 and 78: Jabiru Aircraft Pty LtdInstruction
- Page 79 and 80: Jabiru Aircraft Pty LtdInstruction
- Page 81 and 82: Jabiru Aircraft Pty LtdInstruction
- Page 83 and 84: Jabiru Aircraft Pty LtdInstruction
- Page 85 and 86: Jabiru Aircraft Pty LtdInstruction
- Page 87 and 88: Jabiru Aircraft Pty LtdInstruction
- Page 89 and 90: Jabiru Aircraft Pty LtdInstruction
- Page 91 and 92: Jabiru Aircraft Pty LtdInstruction
- Page 93 and 94: Jabiru Aircraft Pty LtdInstruction
- Page 95 and 96: Jabiru Aircraft Pty LtdInstruction
- Page 97 and 98: Jabiru Aircraft Pty LtdInstruction
- Page 99 and 100: Jabiru Aircraft Pty LtdInstruction
- Page 101 and 102: Jabiru Aircraft Pty LtdInstruction
Jabiru Aircraft Pty LtdInstruction & Maintenance ManualJabiru <strong>2200</strong> Aircraft EngineHydraulic Valve Lifter ModelsC51. Disassemble and clean off all carbon.2. Inspect rocker tip for wear. Replace any with excessive wear.3. Measure bushes and record on build sheet.4. If over service limits, replace.Figure 19. Drawing 9449064 – Rocker Bush Removal1. Clean off old Loctite from rocker bore.2. Press in Bushes.Note - The width of the bushes is critical for the correct amount of end float, sothey must be pushed right home.Figure 20. Drawing 9A011A0D – Rocker Shaft Install1. Put capscrew through clamp hole and check rocker end float. Must be 0.1to 0.4mm (0.004" to 0.010").2. Clean up, oil well and reassemble.CylindersThis document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.REVISION 0 1 2 3 4 5 6 7 8 9 Dated : June 2010 Issued By: DPS Page: 52 of 116L:\files\Manuals_For_Products\Engine_Manuals\Transition\JEM2204-9_I&M_unsigned.docx