Hlavní nádraží Praha Prague Central Station - Grandi Stazioni S.p.A.

Hlavní nádraží Praha Prague Central Station - Grandi Stazioni S.p.A. Hlavní nádraží Praha Prague Central Station - Grandi Stazioni S.p.A.

grandistazioni.it
from grandistazioni.it More from this publisher

14. 4. 2011Hlavní nádraží <strong>Praha</strong>Slavnostní otevření za účasti prezidentůVáclava Klause a Giorgia Napolitana<strong>Prague</strong> <strong>Central</strong> <strong>Station</strong>Grand Opening with the Presidents Václav Klausand Giorgio Napolitano in attendance


9 900 m 3zbouránodemolishedTakto to všechno začalo … | It all began here …


1 150 000 000 Kčrozpočet investice <strong>Grandi</strong> <strong>Stazioni</strong> v České republiceinvestment budget of <strong>Grandi</strong> <strong>Stazioni</strong> in the Czech RepublicOd zanedbaného | From neglected …… k opečovávanému | to managed


2 549 m 2nové pokladny a úschovny zavazadelnew ticketing office and left-luggage areasOd odděleného | From distant …… k přístupnému | to accessible


93nových bezpečnostních kamernew cctv camerasOd zastaralého | From old style …… k pokrokovému | to hi-tech


35 000 000cestujících za rokpassengers per yearOd nepřehledného značení | From disorienting …… k promyšlenému | to clear navigation


2 500 m 2instalovaných sítí proti holubůminstalled nets against pigeonsOd opuštěného | From abandoned …… k přátelskému | to friendly


18nových výtahů, eskalátorů a travelátorůnew lifts, escalators and moving walkwaysOd nepohodlného | From unpleasant …… ke komfortnímu | to comfortable


330 000 mnové kabeláženew cablesOd nevábného | From unappealing …… k elegantnímu | to attractive


626 m 2nových veřejných toaletnew public toiletsBez komentáře …… no comment


1871–2011140 let spojujeme Prahu a svět14. 4. 2011 years of connecting <strong>Prague</strong> to the world14. 12. 1871


1871–2011MILNÍKY ÚSPĚŠNÉHO PROJEKTU14. prosince Zahájení provozu Nádraží císaře Františka Josefa I. Název<strong>Praha</strong> Hlavní nádraží nese od ledna 1953.1901 – 1909Rekonstrukce nádraží. Staré budovy Nádraží císaře FrantiškaJosefa I. byly strženy a místo nich byla postavenanová hlavní budova v secesním slohu. Architektonický návrhpřipravil Josef Fanta, podle nějž je budova pojmenována.1972 – 1979Z důvodu zvýšení kapacity přepravy byla k Fantově budověpřipojena nová odbavovací hala podle návrhu Josefa Dandy,Jana Bočana a Aleny a Jana Šrámkových, představujícíčistý styl architektury sedmdesátých let 20. století.17. prosince 2003České dráhy a <strong>Grandi</strong> <strong>Stazioni</strong> uzavřely – na dobu 30 letod dokončení stavebních prací – tři smlouvy o revitalizaci,provozu a správě Hlavního nádraží v Praze, nádraží v MariánskýchLázních a Karlových Varech. Jedná se o pilotnízahraniční projekt italské firmy, která hodlá investovatv České republice více než 1,15 mld. Kč (přibližně 47 milionůEuro).2004 – 2006Společnost <strong>Grandi</strong> <strong>Stazioni</strong> dokončila projektovou dokumentaci,založenou na nové koncepci fungování železničníhonádraží. Nepřitažlivé neosobní prostory se změnív moderní centrum služeb k uspokojení každého přánía potřeb cestujících. Autorem architektonických návrhů jePatrik Kotas. Nadto společnost <strong>Grandi</strong> <strong>Stazioni</strong> zajistilavšechna potřebná povolení, včetně stavebních. Důraz jekladen na bezpečnost, přehledný informační systém uvnitřnádraží a bezbariérový přístup.17. prosince 2006Je stavebně zahájena první etapa kompletní revitalizaceHlavního nádraží <strong>Praha</strong> a nádraží v Mariánských Lázních.Jako generální dodavatel stavby je na základě řádně uskutečněnéhovýběrového řízení vybrána stavební společnostMetrostav.První polovina roku 2008První etapa revitalizovaného Hlavního nádraží v Praze bylaotevřena veřejnosti. Zahrnuje 3 111 m 2 rekonstruovanýchprostor, zejména pak 1 690 m 2 nově vzniklých obchodníchploch. Současně je zahájena druhá etapa revitalizace.Červen 2009Druhá etapa revitalizovaného Hlavního nádraží v Prazebyla otevřena veřejnosti. Zahrnuje 12 087 m 2 rekonstruovanýchprostor, včetně 2 666 m 2 nově vzniklých obchodníchploch a navíc i 2 430 m 2 nového ČD Centra Českýchdrah, kde jsou umístěny pokladny a úschovna zavazadel.Současně je zahájena třetí etapa revitalizace.Listopad 2009Otevření kompletně revitalizovaného nádraží v MariánskýchLázních, což představuje celkově 4 892 m 2 zrekonstruovanýchprostor.Prosinec 2010Třetí etapa revitalizovaného Hlavního nádraží v Prazebyla otevřena veřejnosti a tím byla i dokončena rekonstrukcecelé nové odbavovací haly. To představuje celkově30 038 m 2 zrekonstruovaných prostor nové odbavovacíhaly, včetně 9 902 m 2 nově vytvořených obchodních ploch.14. dubna 2011Slavnostní otevření celé zrekonstruované nové odbavovacíhaly Hlavního nádraží <strong>Praha</strong> za účastí prezidentů Italskérepubliky a České republiky, pana Giorgia Napolitanaa pana Václava Klause.Od nynějška do konce roku 2013Nadchází výzva k revitalizaci a k nalezení nového komerčníhovyužití historické Fantovy budovy.MILESTONES OF A SUCCESS STORYDecember 1871The opening of the Franz Josef I Railway <strong>Station</strong>, re-namedthe <strong>Prague</strong> Main Railway <strong>Station</strong> in January 1953.1901 – 1909The new main building is constructed in the “liberty” styleand is erected in place of the Franz Josef I Railway <strong>Station</strong>,which was based on the architectural plans of JosefFanta; the building today still bears his name.1972 – 1979Following an increase in the demand for transportation,a new building is built adjacent to the Fanta Building, thusresulting in the birth of the New Hall which was based onthe architectural plans of Josef Danda, Jan Bočan, AlenaŠrámková and Jan Šrámek, and represents a clean archetypeof 1970’s architecture.17 December 2003České dráhy and <strong>Grandi</strong> <strong>Stazioni</strong> conclude 3 contracts, forthe duration of 30 years from the completion of the constructionworks, on the revitalization, management andoperation of the <strong>Prague</strong> Main Railway <strong>Station</strong>, as well asfor the Mariánské Lázně and Karlovy Vary Railway <strong>Station</strong>s.Such an undertaking represents the pilot foreignproject of the Italian company, which intends to invest1.15 billion CZK approximately (47 millions € approximately)in the Czech Republic.2004 – 2006<strong>Grandi</strong> <strong>Stazioni</strong> realized the entire design process basedon the new concept of a railway station (no longer as transientplaces without a soul, but rather as service centersestablished to satisfy every anticipated need and desireof the passenger) and the related architectural plans ofPatrik Kotas. Moreover, <strong>Grandi</strong> <strong>Stazioni</strong> arranged for allrelevant planning and construction approvals, includingBuilding Permits. One of the main focuses was on securityand intelligent navigation systems located inside the Railway<strong>Station</strong>s, as well as barrier-free spaces.14. 12. 187114. 4. 2011140 let spojujeme Prahu a světDecember 2006The first construction Phase for the complete revitalizationof the <strong>Prague</strong> Main Railway <strong>Station</strong> and MariánskéLázně Railway <strong>Station</strong>s is launched. The Metrostav constructioncompany is selected as the General Contractorfollowing the proper tender process.First half of 2008Phase I of the complete revitalization of the <strong>Prague</strong> MainRailway <strong>Station</strong> opens to the public, consisting of 3,111sqm of refurbished premises, mainly including 1,690 sqmof newly constructed commercial shop spaces. Additionally,Phase II of the revitalization is simultaneously launched.June 2009Phase II of the <strong>Prague</strong> Main Railway <strong>Station</strong> revitalizationopens to the public, consisting of 12,087 sqm of refurbishedpremises, including 2,666 sqm of newly constructedcommercial shop spaces and 2,430 sqm of new spacedesignated for České dráhy comprising the ticketing officeand left-luggage area. Additionally, Phase III of the revitalizationis simultaneously launched.November 2009Public opening of the completely refurbished MariánskéLázně Railway <strong>Station</strong>, consisting of 4,892 sqm in total ofrefurbished premises.December 2010Phase III of the <strong>Prague</strong> Main Railway <strong>Station</strong> revitalizationopens to the public, and thus the New Hall is refurbishedin its entirety. Resulting in a total of 30,038 sqm of refurbishedpremises of the New Hall, including 9,902 sqm intotal of newly constructed commercial shop spaces.14 April 2011Grand opening ceremony for the entirely refurbished NewHall of the <strong>Prague</strong> Main Railway <strong>Station</strong> with the Presidentsof the Italian and Czech Republics, Giorgio Napolitanoand Václav Klaus, in attendance.years From of present connecting until the end <strong>Prague</strong> of 2013 to the worldLaunch of the challenging revitalization and new commercialexploitation of the historical Fanta Building.


Poznejte nový rozměr cestováníDiscover a new dimension of travellingMore than travel


64nových obchodůnew shopswww.tally-weijl.comVíc než módaMore than fashion


9 902 m 2nových obchodních plochnew commercial areasVíc než občerstveníMore than dining


1 270 m 2nové knihkupectvínew bookstoreVíc než dárkyMore than gifts


2 350nových sprinklerových hlavicnew sprinkler headsVíc než službyMore than services


12 052 m 2instalovaných podhledůinstalled suspended ceilingsVíc než kosmetikaMore than cosmetics


16 600 m 2povrchů rozvodů klimatizacesurfaces of the air-conditioning ductsVíc než delikatesyMore than delights


4 800 m 2zasklení včetně nové fasádyglazing including the new facadeVíc než komfortMore than comfort


6 244 m 2nových technických plochnew technical areasVíc než technologieMore thantechnologies


707vlaků dennětrains dailyVíc než nádraží!More than station!


14. 4. 2011Rozzářili jsme Hlavní nádraží <strong>Praha</strong>Lights are Turned on in the <strong>Prague</strong> <strong>Central</strong> <strong>Station</strong><strong>Grandi</strong> <strong>Stazioni</strong> Česká republika, s.r.o.e-mail: info@grandistazioni.cztel.: +420 222 874 446www.grandistazioni.czHlavní nádraží <strong>Praha</strong>Slavnostní otevření za účasti prezidentůVáclava Klause a Giorgia Napolitana<strong>Prague</strong> <strong>Central</strong> <strong>Station</strong>Grand Opening with the Presidents Václav Klausand Giorgio Napolitano in attendance