24.11.2012 Views

Traffic Management for the Available Bit Rate (ABR) Service in ...

Traffic Management for the Available Bit Rate (ABR) Service in ...

Traffic Management for the Available Bit Rate (ABR) Service in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 9.5: Multiple unidirectional VCs <strong>in</strong> a VS/VD switch<br />

FRMs are turned around by <strong>the</strong> previous loop VD to <strong>the</strong> previous loop VS. BRMs<br />

are processed by <strong>the</strong> next loop VS to update <strong>the</strong> correspond<strong>in</strong>g ACRs.<br />

Figure 9.6: Multiple bi-directional VCs <strong>in</strong> a VS/VD switch<br />

We will discuss <strong>the</strong> rates and allocations of VC1 only. VC1 has two ACRs: ACR 1<br />

<strong>in</strong> <strong>the</strong> reverse direction on L<strong>in</strong>k1 and ACR 2 <strong>in</strong> <strong>the</strong> <strong>for</strong>ward direction on L<strong>in</strong>k2. Hence-<br />

<strong>for</strong>th, <strong>the</strong> subscript 1 refers to <strong>the</strong> \previous loop" variables and subscript 2 to <strong>the</strong><br />

\next loop" variables of VC1.<br />

343

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!