11.07.2015 Views

Ft. Irwin Desert Tortoise Translocation I

Ft. Irwin Desert Tortoise Translocation I

Ft. Irwin Desert Tortoise Translocation I

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIA<strong>Ft</strong>. <strong>Irwin</strong> Land Expansion and<strong>Desert</strong> <strong>Tortoise</strong> <strong>Translocation</strong>Muhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 1 of 819-Aug-08


Background:NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIA• 2000 – Congress approves land expansion• 2004 USFWS gives land expansion Biological Opinion• 2006 USFWS gives translocation Biological Opinion• 2007 Army began initial translocation effortsThe translocation is being conducted as a scientifically-basedresearch and monitoring program, guided by a peer-reviewedtranslocation plan developed by the U.S. Geological Survey.Muhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 2 of 819-Aug-08


NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIACurrent Status: SOUTHERN EXPANSION AREASpring 2008 -- 556 desert tortoises translocated to dateFuture plans:1. Approximately 100 tortoises remain in the SEA—plans torelocate early fall 20082. <strong>Desert</strong> tortoise fence damageMuhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 3 of 819-Aug-08


NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIACurrent Status: WESTERN EXPANSION AREA• Spring 2008 -- initial desert tortoise surveys begun• Researchers found many more tortoises than original estimateFuture plans:1. Fall 2008 – massive survey efforts in the WEA2. <strong>Desert</strong> tortoise fencing3. USGS will write translocation plan amendment for the WEA‣<strong>Translocation</strong> site selection‣Survey methodology‣<strong>Translocation</strong> proceduresMuhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 4 of 819-Aug-08


NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIA<strong>Translocation</strong> Research and Monitoring:400 translocated and 350 resident and “control”tortoises from the SEA have been allocated to an intensivemonitoring program and several research projects:• Physiological stresses due to translocation• Health of translocated tortoises over time• Various aspects of the translocation process itselfMonitoring efforts and research activitiesfor all projects are ongoingMuhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 5 of 819-Aug-08


NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIAMeasures of success:The ultimate measure of success• DNA profiling to identify the recruitment of translocatedtortoises into the host population.An immediate measure of success• Reproductive activity• Researchers have found HIGH reproductive activity intranslocated tortoisesMuhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 6 of 819-Aug-08


Current Status:NATIONAL TRAINING CENTERFORT IRWIN, CALIFORNIACOYOTE PREDATIONPre-translocation depredations – 48 tortoisesPost-translocation depredations – 93 tortoises•Resident/control – 40 dead / 360 resident tortoises (11.1%)•Translocated – 53 dead / 411 translocated tortoises (12.9%)Future Plans:USDA Wildlife Services will attempt to remove coyotesMost prudent scientific methods will be used to controlpredationMuhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 7 of 819-Aug-08


Muhammad Bari, muhammad.bari@irwin.army.mil DSN 470-3410Page 8 of 819-AUG-08ENVIRONMENTAL DIVISIONQuestions??

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!