11.07.2015 Views

Planck Pre-Launch Status Papers - APC - Université Paris Diderot ...

Planck Pre-Launch Status Papers - APC - Université Paris Diderot ...

Planck Pre-Launch Status Papers - APC - Université Paris Diderot ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A&A 520, A3 (2010)Fig. 15. Level 3 pipeline structure.Fig. 16. IDIS ProC pipeline editor.official tests conducted with ESA, without referring to the internaltests that were dedicated to DPC subsystems. Level 1 was themost heavily tested, as this pipeline is considered launch-critical.As a first step, it was necessary to validate the output with respectto the input; to do that, we ingested inside the instrumentawellknownsignalasdescribedinFrailis et al. (2009)withthepurpose of verifying whether the processing inside Level 1 wascorrect. This also had the benefit of providing an independenttest of important functionalities for the REBA software responsiblefor the onboard preprocessing of scientific data. Afterwards,more complete tests, including allinterfaceswithotherelementsof the ground segment, were performed. Those tests simulatePage 20 of 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!