11.07.2015 Views

2/2012 - Fingrid

2/2012 - Fingrid

2/2012 - Fingrid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

these projects will actually become reality.From ideas to solutionsTransmission system planners use initialinformation acquired by them tosketch various scenarios for the futureprospects in a certain area and explorewhat kinds of impacts these have onthe transmission network. Will there bea need for new high-voltage transmissionlines or substations? How couldwind power capacity be connected tothe system? Does a network companyneed a new transmission line connectionbecause of the expansion of itsown network?The regional plans also take into accountthe management of the ageingof the transmission system. The systemmay contain parts that should be dismantled,repaired, or rebuilt entirely.“We always aim to use the existingnetwork as optimally as possible. Wecannot and should not make preparationsfor every eventuality by overbuildingthe system. It is our goal tofind flexible as well as technically andeconomically correct solutions in atimely fashion. This is so because networkconstruction is very expensive,Electricity productionanticipation iscomplicated by factorssuch as uncertaintiesinvolved in theconstruction of windpower capacity.and the network also has environmentalimpacts,” Antero Reilander says.The planning team works together,but each member also works independently.After joint meetings for creatingideas, it is time to return to the computerto simulate the possible solutions.Antero Reilander says that the work ismuch about dialogue and about lettingideas evolve.The plans are modified on the basisof feedback received during the discussions.A regional plan shaped andhoned in co-operation with the customersis distributed to all parties ina shared event arranged by <strong>Fingrid</strong>. Ifnecessary, customer-specific confidentialreports address the developmentneeds involved in the network and gridconnections of a particular customer. Ittakes about a year to draw up the regionalplan.“When we can do things for the regionalplans in advance with no hurryand when we have proper discussionswith all stakeholders, the actual implementationof the projects is also mucheasier,” says Antero Reilander.FINGRID 2/<strong>2012</strong> | 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!