ii. Form-I does not mention <strong>the</strong> details <strong>of</strong> river/tributary on which <strong>the</strong> barrage isproposediii. The proposed TOR is not available with Form-I. The standard TOR <strong>for</strong> irrigationproject may be collected from <strong>the</strong> Ministry and accordingly <strong>the</strong> different items <strong>for</strong>investigation/study should be added based on <strong>the</strong> site specific conditionsiv. For a study <strong>of</strong> 25,000 ha <strong>of</strong> command area, a minimum <strong>of</strong> 15-20 sampling sitesare needed <strong>for</strong> determination <strong>of</strong> soil, surface water and groundwater parametersv. There should be at-least 10% <strong>of</strong> <strong>the</strong> command area earmarked <strong>for</strong>commissioning pressurized irrigation system (sprinkler/drip etc) with suitablecropping pattern which may different than <strong>the</strong> rest <strong>of</strong> <strong>the</strong> command area.Accordingly, <strong>the</strong>re should be 5 parcels <strong>of</strong> command area @ 500 ha each shouldbe earmarked <strong>for</strong> introducing pressurized irrigation which is to be commissionedand maintained at <strong>the</strong> project costvi. The EMP <strong>of</strong> <strong>the</strong> project is to contain a section on Command Area Development(CAD) wherein <strong>the</strong> CAD and <strong>the</strong> OFD plan should be discussed along with asample plan <strong>for</strong> an outlet command. The sample plan is to show <strong>the</strong> watercourse, field channels, field drains and <strong>the</strong> o<strong>the</strong>r relevant features <strong>of</strong> CAD andOFD activities. A Table should be given to indicate <strong>the</strong> target date <strong>of</strong> progress <strong>of</strong><strong>the</strong> CAD and <strong>the</strong> OFD activities, which are to be co-terminus with <strong>the</strong> projectcompletion time.vii. The plan (if any) <strong>of</strong> conjunctive use <strong>of</strong> surface water and groundwater <strong>for</strong>irrigation and <strong>the</strong> energy availability situation <strong>for</strong> pumping groundwater may begiven in <strong>the</strong> EMP.viii. In <strong>for</strong>m 1 part III (Environmental Sensitivity) <strong>the</strong> answer to point no. 1 should beyes since <strong>the</strong> <strong>for</strong>est land coming under submergence is protected under nationallegislation. Annexure IV referred in point no 2 has not been provided. In pointno. 3 <strong>the</strong> answer should be „yes‟ since <strong>the</strong>re is a possibility <strong>of</strong> area being usedby sensitive species <strong>of</strong> <strong>the</strong> region since 442 ha <strong>of</strong> <strong>for</strong>est land is beingsubmerged/utilised.The committee mentioned that <strong>the</strong> project proponent is not able to provide/sendminim required documents i.e. Pre-feasibility Report (PFR), detailed hydrological data <strong>for</strong><strong>the</strong> project and a draft TOR <strong>for</strong> irrigation project in order to go through documents by <strong>the</strong>members to get an clear view, idea and understand <strong>the</strong> details <strong>of</strong> <strong>the</strong> project be<strong>for</strong>ecoming to EAC meeting.The <strong>Committee</strong> mentioned that <strong>the</strong> project proponent should resubmit <strong>the</strong> PFR andForm-I incorporating <strong>the</strong> above in<strong>for</strong>mation <strong>for</strong> fur<strong>the</strong>r consideration <strong>of</strong> <strong>the</strong> project.3. O<strong>the</strong>r items pertaining to extension <strong>of</strong> <strong>the</strong> validity <strong>of</strong> TORThe following projects were taken-up <strong>for</strong> <strong>the</strong> extension <strong>of</strong> <strong>the</strong> Validity Period <strong>for</strong> TOR:3.1 Extension <strong>of</strong> <strong>the</strong> Validity Period <strong>of</strong> TORs <strong>for</strong> Simang-I HEP (67 MW) andSimang-II HEP (66 MW) project in Arunachal Pradesh by M/s. AdishankarPower Pvt. Ltd.The project proponent requested <strong>the</strong> Ministry <strong>for</strong> <strong>the</strong> extension <strong>of</strong> <strong>the</strong>ir Simang-IHEP (67 MW) and Simang-II HEP (66 MW) projects in Arunachal Pradesh on <strong>the</strong> plea that

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!