11.07.2015 Views

Minutes of the 61st Meeting of the Expert Appraisal Committee for ...

Minutes of the 61st Meeting of the Expert Appraisal Committee for ...

Minutes of the 61st Meeting of the Expert Appraisal Committee for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

viii.ix.Soil and water sampling locations be so selected that <strong>the</strong>y are evenlydistributed in <strong>the</strong> head , middle and tail reaches <strong>of</strong> canal network and <strong>the</strong>sampling locations are to be shown on a mapDetailed plan <strong>for</strong> covering 10% <strong>of</strong> <strong>the</strong> area command area underpressurized/drip irrigation, including its cost.x. Morpho-tectonic map <strong>of</strong> <strong>the</strong> study area should be preparedto estimate <strong>the</strong>channel migration patterns.xi.xii.xiii.Under soil sampling, additional parameters e.g, soil pH <strong>of</strong> <strong>the</strong> saturationextract, Water Holding Capacity, Field Capacity, Wilting point, Calcium,Magnesium, Potassium, Sodium should be studiedTen (10) sampling locations are to be covered under terrestrial ecologicalsurveyConsidering large number <strong>of</strong> project affected families (PAFs), a separateSocial Impact Assessment Study to be carried-outThe <strong>Committee</strong> mentioned that <strong>the</strong> project proponent should to resubmit <strong>the</strong> PFRand Form-I incorporating <strong>the</strong> above in<strong>for</strong>mation <strong>for</strong> fur<strong>the</strong>r consideration.2.10 Sip Kolar Link Medium Irrigation Project in Sehore District <strong>of</strong> Madhya Pradeshby M/s. Water Resources Department, Government <strong>of</strong> Madhya Pradesh – ForTOR [J-12011/42/2012-IA-I]The Principal Secretary (Irrigation) made a detailed presentation on <strong>the</strong> project. Thecommittee noted that <strong>the</strong> Sip Kolar project is a diversion project proposed to augmentexisting Kolar reservoir. The existing Kolar project was granted environmental clearanceon 6.4.1984 by <strong>the</strong> Ministry and <strong>the</strong> project was completed in 1989. The <strong>for</strong>est clearancewas granted on 10.6.2009. The Kolar project was proposed to irrigate 45,078 ha <strong>of</strong> areabut only 31,000 ha is being irrigated presently. The presentation document howevershowed irrigation coverage <strong>of</strong> only 22,868 ha (maximum in 2006-07). There<strong>for</strong>e, <strong>the</strong> SipKolar project is proposed to divert water into <strong>the</strong> existing Kolar project <strong>for</strong> augmentationand to irrigate an area <strong>of</strong> 6,400 ha. A total <strong>of</strong> 39.92 ha <strong>of</strong> <strong>for</strong>est land involved in <strong>the</strong>proposed Sip Kolar project <strong>for</strong> which <strong>for</strong>est clearance has already been obtained. In <strong>the</strong>proposed project 34.36 Mcum <strong>of</strong> water <strong>of</strong> Sip basin is to be diverted to Kolar reservoir toaugment <strong>the</strong> present Kolar project live capacity. A TAC note <strong>for</strong> <strong>the</strong> project has beenprepared by <strong>the</strong> director M&A, CWC, Narmada Basin Organisation on 22-03-2012. Fur<strong>the</strong>rdevelopment is not known. A 6.51 km long diversion channel and 5.94 km long tunnel willbe constructed to divert water from Sip basin. The catchment area <strong>of</strong> <strong>the</strong> project is 96.50Sq.km. There is no national park/ wildlife sanctuary/biosphere reserve/historicalmonuments are present in <strong>the</strong> project area. The project cost is about Rs. 9260.19 lakhsPrima-facie, <strong>the</strong> project appeared to be simple <strong>for</strong> augmenting <strong>the</strong> water availabilityin <strong>the</strong> existing Kolar reservoir as <strong>the</strong> current availability is found to be inadequate to meet<strong>the</strong> irrigation water requirement <strong>of</strong> <strong>the</strong> command area. However, during <strong>the</strong> detailedpresentation <strong>the</strong> requirement <strong>of</strong> three diversion structures was revealed, involvingconstruction <strong>of</strong> 18 m high diversion dam <strong>for</strong> sip diversion and not a weir. The need <strong>for</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!