CAN IT WORK FOR YOU?Cost-<strong>effective</strong>, <strong>low</strong> <strong>impact</strong> <strong>large</strong><strong>wood</strong> <strong>replenishment</strong>


Granite Creek Large WoodReplenishment ProjectCooperators/LeadsWash<strong>in</strong>gton Dept of Fish and Wildlife/Sandy DottsUnited States Forest Service/Jill CobbPriest Community Forestry Connection/Liz Johnson-GebhardtUS Fish and Wildlife/Carrie CordovaSalmon Recovery Fund<strong>in</strong>g Board/Dave CaudillDouglas Construction and Custom Cutt<strong>in</strong>g/Todd Douglas


WHAT? Install<strong>in</strong>g Large WoodStructures with Grip Hoist


WHY? Project Inspiration……• Granite Creek Watershed Assessment• Scott Nicolai, Yakima Nation, SRFB Conference


REAL REASON FOR PROJECTBull Trout and Westslope CutthroatTrout RestorationPhoto courtesy of the Kalispel Tribe


Let’s talk aboutMETHOD COMPARISONSimpleCheapUniqueTRADITIONAL(excavator)Cost per stem $1,000 $215Structure complexity Variable LowEnvironmental <strong>impact</strong> High LowPermitt<strong>in</strong>g Complex NegligibleDesign Complicated SimpleLOW IMPACT(grip hoist, directionalfell<strong>in</strong>g)Monitor<strong>in</strong>g Photos at eye level Low Elevation Photos


It all startswith aplan….


The Implementation Plan


Two basic approachesGrip Hoist log placementDirectional fell<strong>in</strong>g


Directional Fall<strong>in</strong>g


Trees moved with Grip Hoist


Ahhhh the GRIP HOIST: love and hateTwo Grip Hoist: TU-28 ($1900) and TU-17 ($1200)Heavy to transport ~90 lbs. to 100 lbs.


ActualImplementation


Thoughts from our Contractor (Todd Douglas)


Unique Monitor<strong>in</strong>g


Monitor<strong>in</strong>g Inchannel StructuresConventional CameraHelipics: Aerial Photography


Granite Large WoodSummary•Total Cost: $140,000•Total stems: 380 trees over seven miles of stream•Six Partners/ Collaborators•Completed <strong>in</strong> six weeks


Lessons Learned•Safety trumps everyth<strong>in</strong>g• Cable break<strong>in</strong>g <strong>in</strong>cident• Not <strong>for</strong> weekend volunteers• Got to know what you are do<strong>in</strong>g• Read the tree/Read the stream•Have a good team/communicate often•Use the best tools <strong>for</strong> the job•Early plann<strong>in</strong>g•Not <strong>for</strong> fa<strong>in</strong>t of heart eng<strong>in</strong>eers – not exact•Need to be flexible <strong>in</strong> design, implementation, adaptable•Give the river material to work with; don’t <strong>for</strong>ce theriver – help it.


And will you succeed? Yes! You will, <strong>in</strong>deed! (98 and ¾percent guaranteed.)Dr. Seuss , Oh the Places You’ll go!