11.07.2015 Views

Annual Report - City of Bayswater

Annual Report - City of Bayswater

Annual Report - City of Bayswater

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Halliday HousePeninsula Hotel bay window restorationCapital worksThe <strong>City</strong> completed numeroussignificant projects in 2009-10,including:Bardon ParkIn 2008 the <strong>City</strong> as part <strong>of</strong> itspublic toilet replacement programinstalled a dual self cleaning toiletmodule within a brick structure thatcomplements the river foreshore.Construction <strong>of</strong> the toilet commencedin July 2009 and was completedin October 2009. Total cost for theproject was $309,663, comprising$133,362 for the building and$176,301 for the Exeloo module.Morley Senior Citizens CentreOne <strong>of</strong> the Centre’s unused smallstorage rooms was converted intoa new unisex toilet for persons withdisabilities. The project commencedin January 2010 and was completedin March 2010 at a cost <strong>of</strong> $11,394.Maylands Sportsman ClubThe kitchen facility at the MaylandsSportsman and Recreation Clubhas been transformed from anold outdated room into a cleanstreamlined functional space.The project commenced in January2010 and was completed in February2010 at a cost <strong>of</strong> $31,053.Hinds Reserve Rowing shedAs part <strong>of</strong> the Swan River Trustapproval for the additions to the HindsReserve rowing shed, the <strong>City</strong> re-cladthe external facia <strong>of</strong> the front elevation<strong>of</strong> the building. Works were completedin March 2010 at a cost <strong>of</strong> $11,860.<strong>Bayswater</strong> WavesThe <strong>City</strong> received funding <strong>of</strong>$143,000 from the Regional LocalInfrastructure Program towards theconstruction <strong>of</strong> a purpose built spinroom, incorporated into the existingCentre’s health club.Upgrades undertaken to the<strong>Bayswater</strong> Waves facility included:• installation <strong>of</strong> new carpet tiles• painting <strong>of</strong> the grandstand• upgrading <strong>of</strong> shower and toiletfacilitiesThe works were completed in June2010 and represented an investmentby the <strong>City</strong> <strong>of</strong> $166,108.<strong>Bayswater</strong> Senior Citizens CentreRo<strong>of</strong> cladding to the <strong>Bayswater</strong> SeniorCitizen Centre was replaced at a cost<strong>of</strong> $27,273.As part <strong>of</strong> the ro<strong>of</strong> replacement, allevaporative air conditioning unitswere removed and replaced with newreverse cycle air conditioning at a cost<strong>of</strong> $78,455.In addition, the Centre’s internalsurfaces were repainted at a cost <strong>of</strong>$17,800.The above works were completed inJune 2010.Peninsula HotelHistorical restoration work to the baywindow and façade <strong>of</strong> this iconicheritage listed building commencedin July 2009 and was completed inOctober 2009 at a cost <strong>of</strong> $84,681.Halliday HouseAs part <strong>of</strong> the Federal Governmentinfrastructure grants program, the <strong>City</strong>was successful in obtaining $60,000in funding for landscaping, reticulation,path ways and tuck pointing <strong>of</strong>brickwork. Tuck pointing works werecompleted in January 2010 at a cost<strong>of</strong> $5,850.26 city <strong>of</strong> bayswater annual report 2009-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!