11.07.2015 Views

Annual Report - City of Bayswater

Annual Report - City of Bayswater

Annual Report - City of Bayswater

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Parks and GardensPublic open spacemaintenanceDuring the year, Parks and Gardensworked to maintain and care for over200 landscaped areas, includingparks, landscaped gardens, andstreetscapes. This involved treepruning, mowing, gardening, irrigationand playground maintenance.Bore and pumpreplacement programIn 2009-10, the <strong>City</strong> shifted itsfocus from upgrading gardens torenewing assets.The <strong>City</strong> replaced irrigation pumpswith new systems at Trewin Park,Station Gardens, Feredy Reserve,Mills Reserve, Essex Reserve, andMorley Drive East Road Reserve.The new systems will increasereliability and efficiency <strong>of</strong> water use.Reducing fertilisers andwater useThe <strong>City</strong> monitored fertiliser andwater use throughout the year usingLysemeters or moisture meters.These were placed in a variety <strong>of</strong>locations and the data used to helpreduce the amount <strong>of</strong> ground waterand fertiliser used on the <strong>City</strong>’s parksand reserves.In addition, a qualified agronomistwas engaged by the <strong>City</strong> to testthe levels <strong>of</strong> nutrients in the grassleaf and soil <strong>of</strong> public open spaces.This helped determine the nutritionalrequirements <strong>of</strong> the turf grass tohelp minimise run <strong>of</strong>f and leaching <strong>of</strong>excess fertiliser.Irrigation system upgradesDuring 2009-10, the irrigationsystems at Joan Rycr<strong>of</strong>t Reserveand Halliday Park, <strong>Bayswater</strong> wereupdated to increase water usageefficiency. This involved introducingHydro-zoning, which is the practice<strong>of</strong> grouping together areas andplants with similar watering needs.Landscape refurbishmentNew seats and picnic settings werepurchased and installed at BathStreet Park, Kanumbla Reserve,Waltham Reserve and Arbor Park.Galleria Shopping Centre, Morley18city <strong>of</strong> bayswater annual report 2009-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!