RDML McManamon SNA 11 Jan - Navsea
RDML McManamon SNA 11 Jan - Navsea RDML McManamon SNA 11 Jan - Navsea
Fleet Intro Surface Ship Readiness Initiative (SSRI) Expected Expected p Service Life Assess Ship TSRA Contin Continuous o s SSustainment stainment Process Maintain Readiness Readiness Sustainment Execute Avail. Avail Ex. & Work Cert Pl Plan Maintenance M i t SURFMEPP Decom Assessments: • Skilled techs performing documented procedures • Utilize NMD & other tools • Mission specific focus SURFMEPP: • Class Maint. Planningg • Availability Planning • Maint. Planning Data Systems • Cost Engineering • Material Management Avail Ex. & Work Cert: • Technical Adjudication of work • Event Readiness • Test & Certification of work Sustainment: • Maintenance Engineering • Performance Monitoring • Fleet Engineering Support • Training & Tech. Docs • Obsolescence 26
Shipp Hommeport Avaail Type SSRI Pilot Ship Progress 14 October 2010 Update Starrt Date Endd Date Endd‐to‐End Proocess Possition LSD 43 Norfolk EDPMA 5/10/2010 3/7/2011 Begun LPD 17 Norfolk CMAV 5/31/2010 6/18/2010 Begun LSD 47 San Diego EDPMA 7/21/2010 6/15/2011 Begun DDG 51 Norfolk EDSRA 8/4/2010 1/28/2011 Begun DDG 105 San Diego PSA 9/8/2010 12/13/2010 Begun CG 66 Mayport DSRA 9/29/2010 3/23/2011 Begun LPD 18 San Diego g PMA 11/2/2010 // 1/9/2011 // A‐27 LHD 6 San Diego DPMA 11/3/2010 7/13/2011 A‐28 FFG 54 Puget Sound SRA 11/15/2010 2/4/2011 A‐40 DDG 67 Norfolk SRA 1/5/2011 4/5/2011 A‐90 MCM 2 Japan DSRA 1/12/2011 4/13/2011 A‐97 MCM 3 San Diego DSRA 1/12/2011 3/16/2011 A‐97 CG 65 Pearl Harbor DSRA 1/19/2011 7/13/2011 A‐104 MCM 13 Bahrain DSRA 1/31/2011 5/2/2011 A‐116 DDG 81 Norfolk DSRA 2/9/2011 5/25/2011 A‐124 DDG 65 San Diego EDSRA 2/16/2011 8/3/2011 A‐131 FFG 38 San Diego DSRA 5/4/2011 8/5/2011 A‐209 Full Test, 0 “gaps” Partial Test, significant “gaps” Asssessment Proogram Avaail Ex & Woork Cert Susstainment Proogram Partial Test, minor “gaps” No Yield, major “gaps” Enhance ESL & Improve Readiness on Every Hull RMMC Manning SURRFMEPP 27
- Page 1 and 2: Surface Ship Maintenance S Sustaini
- Page 3 and 4: Bridge to the Fleet � SEA 21 is t
- Page 5 and 6: Take Away: SEA 21A Is… • The si
- Page 7 and 8: Surface Ship End-to-End Process Map
- Page 9 and 10: SSLCM to SURFMEPP Transition SURFME
- Page 11 and 12: Corrosion Control Corrosion Control
- Page 13 and 14: ABS Assessments Example of SSLCM /
- Page 15 and 16: Back Up • SSRI Process • SSRI P
- Page 17 and 18: THE PLAN - BAE San Diego: Pilot Pha
- Page 19 and 20: “RAP” = Resource Allocation Pro
- Page 21 and 22: M-Curve Implementation Way y Ahead:
- Page 23 and 24: CNRMC Lines of Report RDA CNO ECH I
- Page 25: ST1 & LCMG Status Efforts in Progre
- Page 29 and 30: TSRA (Cont’d) Status • DRAFT TY
- Page 31 and 32: • Transition to SURFMEPP SSLCM to
- Page 33 and 34: Availability Execution & Work Certi
- Page 35 and 36: Phase Action Iteems Next Steps S Ph
- Page 37 and 38: Phase Items Action Neext Steps Phas
Fleet<br />
Intro<br />
Surface Ship Readiness Initiative (SSRI)<br />
Expected Expected p Service Life<br />
Assess Ship<br />
TSRA<br />
Contin Continuous o s SSustainment stainment<br />
Process<br />
Maintain Readiness<br />
Readiness<br />
Sustainment<br />
Execute<br />
Avail.<br />
Avail Ex. & Work Cert<br />
Pl Plan Maintenance<br />
M i t<br />
SURFMEPP<br />
Decom<br />
Assessments:<br />
• Skilled techs performing<br />
documented procedures<br />
• Utilize NMD & other tools<br />
• Mission specific focus<br />
SURFMEPP:<br />
• Class Maint. Planningg<br />
• Availability Planning<br />
• Maint. Planning Data Systems<br />
• Cost Engineering<br />
• Material Management<br />
Avail Ex. & Work Cert:<br />
• Technical Adjudication of work<br />
• Event Readiness<br />
• Test & Certification of work<br />
Sustainment:<br />
• Maintenance Engineering<br />
• Performance Monitoring<br />
• Fleet Engineering Support<br />
• Training & Tech. Docs<br />
• Obsolescence<br />
26