Findings<br />
• Software issues<br />
– Cribmaster support was required to resolve software issues<br />
– Manual head count was very close to manning expectation;<br />
electronic data shows manpower shortages.<br />
– We preformed manual head counts several times that<br />
showed h d actual t l manning i vs. projected j t d manning i results lt within ithi<br />
10%. Electronic data showed 50-60% shortage<br />
• Structural placement<br />
– Location of receiver important. Cribmaster verified location<br />
and installation of antenna<br />
• Excellent Management tool<br />
– Time on task clearly displayed, even with limited data<br />
collection<br />
BAE Systems Proprietary Information<br />
BAE SDSR Pilot<br />
Mid-Term Findings: g<br />
4<br />
M-Curve Implementation – San Diego Ship Repair LPR Pilot<br />
Recommendations for improvement<br />
• Research the possibility of having the RFID tag embedded into the hard<br />
hat by y the manufacturer. Ship p Yard work environment ( (i.e. inclement<br />
weather, hydro blasting, etc.), can render the RFID tag inoperable.<br />
• Standardized placement of antennas on brows would prevent<br />
reconfiguration for each pier side availability and erroneous data.<br />
Reporting Process<br />
• BAE SSystems t has h collected ll t d data d t on a daily d il bbasis i ffor all ll ddepartments t t by b<br />
shift. The reports are available to various departments within BAE<br />
Systems. On a weekly basis, SDSR provides SWRMC and SEA 21 with<br />
a PDF snapshot of the M-Curve report, reflecting one day’s activity with<br />
verification back up information.<br />
BAE Systems Proprietary Information<br />
5<br />