THE PLAN – BAE San Diego:<br />
Pilot Phase 1: DDG 53 EDSRA (23 Jun SOA)<br />
– Limited to 4 BAE trades & 1 Subcontractor<br />
Pilot Phase 2: DDG 76 SRA ( 8 Sep SOA)<br />
– Expanded to all trades and all workers to include subcontractors<br />
MSMO M-Curve<br />
Pilot Implementation – BAE SDSR:<br />
Pilot Phase 1 Timeline<br />
DDG 53 (JOHN PAUL JONES) EDSRA<br />
End JPJ Monitoring<br />
• Funding in place 3 May<br />
• Purchase Order processed 5May 5 May<br />
• Equipment Delivered to BAE 28 May<br />
• Install and Test 9-16 June<br />
• Start of Availability DDG 53 EDSRA 23 June<br />
DDG 76 (HIGGINS) SRA<br />
Goal: Demonstrate capability to track ingress and<br />
egress of shipyard personnel onto ships pier side or<br />
into drydock y areas in a pprivate ship p repair p yyard.<br />
The<br />
Proof of Concept is limited in scope and duration.<br />
Post Analysis<br />
6/10 7/10 8/10 9/1 10/1 <strong>11</strong>/1 12/1 1/<strong>11</strong> 2/<strong>11</strong><br />
Pilot Phase 2 Timeline<br />
• Equipment qu p e t Delivered e e ed to BAE 28 8 May ay<br />
• Start of Availability DDG 76 SRA 8 Sep<br />
Pilot Phase 1 Complete; Phase 2 Underway…<br />
3/<strong>11</strong><br />
17