THE PLAN – BAE San Diego:<br />

Pilot Phase 1: DDG 53 EDSRA (23 Jun SOA)<br />

– Limited to 4 BAE trades & 1 Subcontractor<br />

Pilot Phase 2: DDG 76 SRA ( 8 Sep SOA)<br />

– Expanded to all trades and all workers to include subcontractors<br />

MSMO M-Curve<br />

Pilot Implementation – BAE SDSR:<br />

Pilot Phase 1 Timeline<br />

DDG 53 (JOHN PAUL JONES) EDSRA<br />

End JPJ Monitoring<br />

• Funding in place 3 May<br />

• Purchase Order processed 5May 5 May<br />

• Equipment Delivered to BAE 28 May<br />

• Install and Test 9-16 June<br />

• Start of Availability DDG 53 EDSRA 23 June<br />

DDG 76 (HIGGINS) SRA<br />

Goal: Demonstrate capability to track ingress and<br />

egress of shipyard personnel onto ships pier side or<br />

into drydock y areas in a pprivate ship p repair p yyard.<br />

The<br />

Proof of Concept is limited in scope and duration.<br />

Post Analysis<br />

6/10 7/10 8/10 9/1 10/1 <strong>11</strong>/1 12/1 1/<strong>11</strong> 2/<strong>11</strong><br />

Pilot Phase 2 Timeline<br />

• Equipment qu p e t Delivered e e ed to BAE 28 8 May ay<br />

• Start of Availability DDG 76 SRA 8 Sep<br />

Pilot Phase 1 Complete; Phase 2 Underway…<br />

3/<strong>11</strong><br />

17