SURFMEPP Stand Up Status<br />
Building on success of SSLCM, SURFMEPP will synergize benefits of HQ and waterfront alignment<br />
PRODUCTS FY09 RESULT FY 10 RESULT FY <strong>11</strong> PLAN<br />
�PR<strong>11</strong> technical “quick-look”<br />
and d parametric t i studies t di �LSD �LSD-41/49 41/49 complete. l t 127 127,000 000 man-day d<br />
Engineering Studies / complete<br />
requirements increase per LSD over<br />
Technical Foundation<br />
Paper (TFPs)<br />
�DDG-51 class complete:<br />
74,000 man-days of<br />
remaining service life per hull<br />
�Completed CG-47 and LHD-1 Class<br />
understated requirements<br />
per DDG<br />
TFPs<br />
�DDG -51, and LSD 41/ 49 SHIPSHEETs<br />
based on TFP<br />
SHIPSHEETS<br />
�Supported TYCOM with all<br />
SHIPSHEETS for FY 12 & FY13<br />
Availabilities. (Unfunded Technical<br />
Requirements (UTR) and high value<br />
targets incorporated)<br />
�BAWP: Business Rules established and<br />
BBaseline li Availability<br />
A il bilit<br />
Work Packages<br />
(BAWPs) /<br />
SSRI (Surface Ship<br />
Readiness Initiative)<br />
�28 �28 of f 28 DDG DDG-51 51 ships hi with ith<br />
FY12 CNO avails being<br />
managed by rigorous and<br />
disciplined process<br />
implemented p by y USFFC/CPF<br />
�SSRI: SURFMEPP is integration node<br />
for End – to –End Surface Ship<br />
Maintenance Process Map<br />
�Initial individual ship transition s from<br />
BAWP to AWP in progress (A-360<br />
milestone)<br />
Corrosion<br />
Control/ABS<br />
�4 ships<br />
�Initiated automated process<br />
to captu capture e ABS S repair epa<br />
recommendations to BAWP<br />
development process<br />
�SURFMEPP leadership for management<br />
of all Surface Ship corrosion initiatives<br />
�Integration teg at o oof ABS S results esu ts in<br />
requirements definition and budgeting<br />
process<br />
�Complete Complete LPD-17 LPD 17 and LCS<br />
TFPs<br />
�Complete Long Range<br />
Maintenance Schedules<br />
(LRMS) ISO DDG/CG/LSD<br />
& LHD individual ships<br />
�Complete SHIPSHEETS<br />
for all Surface Ships to<br />
support POM 13 (Oct / Nov<br />
10)<br />
��<br />
Execution of Business<br />
Rules for FY12<br />
availabilities for<br />
LSD/CG/LHD Class ships.<br />
(70 total ships)<br />
�FY <strong>11</strong>-16 plan ISO<br />
assessing (148) surface<br />
ships<br />
�C �Complete l t automation. t ti<br />
ABS to be a tool, not a<br />
separate program<br />
16