Pilot Ships & Survey Timeline<br />
• LSD 42 USS GERMANTOWN<br />
(EDPMA, 03 Dec 08 - 12 Aug 09, San Diego)<br />
• DDG 67 USS COLE<br />
(DSRA, 15 Apr 09 - 28 June 09, Norfolk)<br />
• CG 53 USS MOBILE BAY<br />
(EDSRA, June 09 - April 10, San Diego)<br />
• FFG 36 USS UNDERWOOD<br />
(DSRA ( 10 Apr p 09 - 6 July y 09, , Mayport) yp )<br />
Material Condition Pilots<br />
Timeline/Products<br />
Pilot Products<br />
• Finite Element Model<br />
• Survey Process Checksheets<br />
• Hull Maintenance Model<br />
• Initial Survey Reports<br />
• SafeNet Doc Documentation mentation<br />
• Ship Life Assessment Booklet<br />
Update<br />
• Hull Maintenance Model Update<br />
• Periodic Survey Plan<br />
#<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
66.<br />
7.<br />
8.<br />
9.<br />
WB #<br />
AMERICAN BUREAU OF SHIPPING<br />
Naval Vessel Hull Assessment Check Sheet<br />
VESSEL:DDG-55<br />
SYSTEM: N/A<br />
TANK: Fuel Tk GP-4<br />
STATUS:<br />
5-300-2-F<br />
Compartment Findings<br />
DATE:<br />
10.<br />
LOCATION: INNERBOTTOM (Fr.300-338) Tk 5-300-2-F<br />
Status<br />
Any RED r esponses should be brought to the attention of the Surveyor -in-C harge prior to sur vey / process being considered complete.<br />
COMMENTS:<br />
Baseline Material Condition<br />
Surveyor<br />
<strong>11</strong><br />
ABS Assessments<br />
FY <strong>11</strong> Ships<br />
USS New Orleans<br />
USS Bonhomme Richard<br />
USS Chosin<br />
USS Winston Churchill<br />
USS Sampson<br />
USS Benfold<br />
USS Ashland<br />
USS Mesa Verde<br />
USS Shoup<br />
USS Barry<br />
USS Sterret<br />
USS Bulkeley<br />
USS Germantown (Revisit)<br />
USS LLake k Ch Champlain l i<br />
USS Port Royal<br />
USS Stout<br />
• Utilizing ABS commercial experience & tracking software<br />
• Focus is Hull Structure & Key Distributed Systems<br />
– Hull, Scantlings, Deckhouse, Tanks<br />
– A/C A/C, El Electric i Pl Plant, CHT CHT, Fi Firemain, i Chill Chilled d WWater<br />
• Finite element models produced<br />
• Risk assessment enables targeted maintenance activity<br />
• Way y ahead – Integration g w/SURFMEPP & RMCs, , CLASSRONs<br />
– Included in ICMP updates<br />
USS GERMANTOWN Survey Summary<br />
WB Tank 6-56-1-W - Severe corrosion breakdown, stiffeners with thinned edges. Recommend blast, renewal of<br />
wasted steel, re-coat tank.<br />
WB Tank 6-43-1-W - Thinned and wasted stiffeners. Recommend renewal.<br />
WB Tank 6-52-1-W 6 52 1 W - Wasted overhead stiffeners stiffeners. Recommend renewal renewal.<br />
WB Tank 6-70-2-W - Heavily wasted overhead stiffeners, transverse bulkhead stiffeners, longitudinal bulkhead<br />
stiffeners, poor coating condition, poor outfitting condition. Recommendations have been<br />
addressed during availability.<br />
WB Tank 6-74-1-W - Tank blasted and coated, holes in stiffeners and plating coated over.<br />
Recommend repair wasted structure.<br />
WB Tank 6-85-4-W - Tank blasted and coated, holes in stiffeners and plating coated over.<br />
Recommend repair wasted structure.<br />
WB Tank 6-101-1-W - Fair coating condition with thinned and wasted transverse bulkhead stiffeners and wasted<br />
overhead longitudinal stiffeners. Recommend repair structure.<br />
WB Tank 3-93-1-W - Poor coating condition, thinned and wasted bulkhead stiffeners and poor condition of the<br />
outfitting in the tank. tank Recommend repair structure structure.<br />
WB Tank 2-107-3-W - Fair coating condition however rated poor due to wastage in way of the<br />
overhead longitudinal stiffeners, holed out deck plating in way of the longitudinal bulkhead<br />
vertical stiffeners and poor condition of the outfitting within the tank. Recommend repair<br />
structure.<br />
WB Tank 5-<strong>11</strong>5-1-W - Fair coating condition, however rated poor due to wastage in way of the overhead<br />
longitudinal stiffeners, after transverse bulkhead vertical stiffeners, and holed out<br />
overhead plating. Recommend repair structure.<br />
WB Tank 5-125-1-W - Poor to fair coating condition however rated poor due to wastage in way of the overhead<br />
longitudinal stiffeners. Recommend repair structure.<br />
Foundations Under - Severely wasted. Renewal required.<br />
A/C Plants<br />
AC Machinery – Tank tops with holes and thinned plate, only minor repairs made in way of holed tank top.<br />
Recommend wasted tank top be renewed.<br />
If this were a commercial vessel and these critical deficiencies were corrected,<br />
ABS would feel confident classing the ship 16<br />
Germantown Initial Results<br />
� Outstanding support from Crew, CLASSRON<br />
and RMC<br />
� Survey identified areas requiring attention<br />
� Analysis demonstrated the following:<br />
• Initial structural design well-conceived<br />
• Structured survey plan necessary to achieve expected<br />
service life<br />
� Developed tools will facilitate analytically-based future<br />
maintenance planning<br />
12<br />