Pilot Ships & Survey Timeline<br />

• LSD 42 USS GERMANTOWN<br />

(EDPMA, 03 Dec 08 - 12 Aug 09, San Diego)<br />

• DDG 67 USS COLE<br />

(DSRA, 15 Apr 09 - 28 June 09, Norfolk)<br />

• CG 53 USS MOBILE BAY<br />

(EDSRA, June 09 - April 10, San Diego)<br />

• FFG 36 USS UNDERWOOD<br />

(DSRA ( 10 Apr p 09 - 6 July y 09, , Mayport) yp )<br />

Material Condition Pilots<br />

Timeline/Products<br />

Pilot Products<br />

• Finite Element Model<br />

• Survey Process Checksheets<br />

• Hull Maintenance Model<br />

• Initial Survey Reports<br />

• SafeNet Doc Documentation mentation<br />

• Ship Life Assessment Booklet<br />

Update<br />

• Hull Maintenance Model Update<br />

• Periodic Survey Plan<br />

#<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

66.<br />

7.<br />

8.<br />

9.<br />

WB #<br />

AMERICAN BUREAU OF SHIPPING<br />

Naval Vessel Hull Assessment Check Sheet<br />

VESSEL:DDG-55<br />

SYSTEM: N/A<br />

TANK: Fuel Tk GP-4<br />

STATUS:<br />

5-300-2-F<br />

Compartment Findings<br />

DATE:<br />

10.<br />

LOCATION: INNERBOTTOM (Fr.300-338) Tk 5-300-2-F<br />

Status<br />

Any RED r esponses should be brought to the attention of the Surveyor -in-C harge prior to sur vey / process being considered complete.<br />

COMMENTS:<br />

Baseline Material Condition<br />

Surveyor<br />

<strong>11</strong><br />

ABS Assessments<br />

FY <strong>11</strong> Ships<br />

USS New Orleans<br />

USS Bonhomme Richard<br />

USS Chosin<br />

USS Winston Churchill<br />

USS Sampson<br />

USS Benfold<br />

USS Ashland<br />

USS Mesa Verde<br />

USS Shoup<br />

USS Barry<br />

USS Sterret<br />

USS Bulkeley<br />

USS Germantown (Revisit)<br />

USS LLake k Ch Champlain l i<br />

USS Port Royal<br />

USS Stout<br />

• Utilizing ABS commercial experience & tracking software<br />

• Focus is Hull Structure & Key Distributed Systems<br />

– Hull, Scantlings, Deckhouse, Tanks<br />

– A/C A/C, El Electric i Pl Plant, CHT CHT, Fi Firemain, i Chill Chilled d WWater<br />

• Finite element models produced<br />

• Risk assessment enables targeted maintenance activity<br />

• Way y ahead – Integration g w/SURFMEPP & RMCs, , CLASSRONs<br />

– Included in ICMP updates<br />

USS GERMANTOWN Survey Summary<br />

WB Tank 6-56-1-W - Severe corrosion breakdown, stiffeners with thinned edges. Recommend blast, renewal of<br />

wasted steel, re-coat tank.<br />

WB Tank 6-43-1-W - Thinned and wasted stiffeners. Recommend renewal.<br />

WB Tank 6-52-1-W 6 52 1 W - Wasted overhead stiffeners stiffeners. Recommend renewal renewal.<br />

WB Tank 6-70-2-W - Heavily wasted overhead stiffeners, transverse bulkhead stiffeners, longitudinal bulkhead<br />

stiffeners, poor coating condition, poor outfitting condition. Recommendations have been<br />

addressed during availability.<br />

WB Tank 6-74-1-W - Tank blasted and coated, holes in stiffeners and plating coated over.<br />

Recommend repair wasted structure.<br />

WB Tank 6-85-4-W - Tank blasted and coated, holes in stiffeners and plating coated over.<br />

Recommend repair wasted structure.<br />

WB Tank 6-101-1-W - Fair coating condition with thinned and wasted transverse bulkhead stiffeners and wasted<br />

overhead longitudinal stiffeners. Recommend repair structure.<br />

WB Tank 3-93-1-W - Poor coating condition, thinned and wasted bulkhead stiffeners and poor condition of the<br />

outfitting in the tank. tank Recommend repair structure structure.<br />

WB Tank 2-107-3-W - Fair coating condition however rated poor due to wastage in way of the<br />

overhead longitudinal stiffeners, holed out deck plating in way of the longitudinal bulkhead<br />

vertical stiffeners and poor condition of the outfitting within the tank. Recommend repair<br />

structure.<br />

WB Tank 5-<strong>11</strong>5-1-W - Fair coating condition, however rated poor due to wastage in way of the overhead<br />

longitudinal stiffeners, after transverse bulkhead vertical stiffeners, and holed out<br />

overhead plating. Recommend repair structure.<br />

WB Tank 5-125-1-W - Poor to fair coating condition however rated poor due to wastage in way of the overhead<br />

longitudinal stiffeners. Recommend repair structure.<br />

Foundations Under - Severely wasted. Renewal required.<br />

A/C Plants<br />

AC Machinery – Tank tops with holes and thinned plate, only minor repairs made in way of holed tank top.<br />

Recommend wasted tank top be renewed.<br />

If this were a commercial vessel and these critical deficiencies were corrected,<br />

ABS would feel confident classing the ship 16<br />

Germantown Initial Results<br />

� Outstanding support from Crew, CLASSRON<br />

and RMC<br />

� Survey identified areas requiring attention<br />

� Analysis demonstrated the following:<br />

• Initial structural design well-conceived<br />

• Structured survey plan necessary to achieve expected<br />

service life<br />

� Developed tools will facilitate analytically-based future<br />

maintenance planning<br />

12<br />

5<br />

12