ncr/doc/Kiosks/TechnicalManuals/7401_Kiosk_Sit... - Alsys Data
ncr/doc/Kiosks/TechnicalManuals/7401_Kiosk_Sit... - Alsys Data ncr/doc/Kiosks/TechnicalManuals/7401_Kiosk_Sit... - Alsys Data
46 Site PreparationTerminal Only (K522 Universal Bracket)The terminal can be mounted on a flat surface or pedestal using theUniversal Mounting Bracket.Flat Horizontal SurfaceMounting PlateK522Securing Screw19295
Site Preparation 47Considerations for Enclosed InstallationsTerminals that are mounted in an enclosure must meet certain thermaland environmental requirements as illustrated and noted in thefollowing pages.Ventilation ClearancesVerify that all clearance specifications are met as shown below.38 mm1.5 in.38 mm1.5 in.76 mm(3 in.)Door ShownOpen203 mm(8 in.)203 mm(8 in.)356 mm(14 in.)154 mm(6 in.)25 mm(1 in.)17315Note: The enclosure in this illustration is typical and is for clearancespecifications only.
- Page 13 and 14: Site PreparationxiRevision RecordIs
- Page 15 and 16: Site PreparationxiiiInternational R
- Page 17 and 18: Site PreparationxvDeclaration of Co
- Page 19 and 20: Site PreparationIntroduction7401-2x
- Page 21 and 22: Site Preparation 3Interpreting the
- Page 23 and 24: Site Preparation 5Customer Responsi
- Page 25 and 26: Site Preparation 77401-2xxx and 3xx
- Page 27 and 28: Site Preparation 97401-2xxx and 3xx
- Page 29 and 30: Site Preparation 11Operating and Se
- Page 31 and 32: Site Preparation 137401-22xx/26xx T
- Page 33 and 34: Site Preparation 157401-25xx/26xx (
- Page 35 and 36: Site Preparation 177401-K540 (12.1
- Page 37 and 38: Site Preparation 197401-K580/590 w/
- Page 39 and 40: Site Preparation 217401 with 2336-K
- Page 41 and 42: Site Preparation 23EasyPoint 45 Ped
- Page 43 and 44: Site Preparation 25NCR 2189 Cash Dr
- Page 45 and 46: Site Preparation 277196 Thermal Rec
- Page 47 and 48: Site Preparation 29Component Weight
- Page 49 and 50: Site Preparation 317401 Power Requi
- Page 51 and 52: Site Preparation 33Power Consumptio
- Page 53 and 54: Site Preparation 35Cable Routing Co
- Page 55 and 56: Site Preparation 377401-4xxxExterna
- Page 57 and 58: Site Preparation 39Terminal with K5
- Page 59 and 60: Site Preparation 41Terminal with K5
- Page 61 and 62: Site Preparation 43Lag Screws (6)1.
- Page 63: Site Preparation 45Printer Only Mou
- Page 67 and 68: Site Preparation 4912.1-inch LCD No
- Page 69 and 70: Site Preparation 51Mounting Specifi
- Page 71 and 72: Site Preparation 53Mounting Specifi
- Page 73 and 74: Site Preparation 55K/F 502 Flush Wa
- Page 75 and 76: Site Preparation 577401-4xxx Mounti
- Page 77 and 78: Site Preparation 597401-4xxx EasyPo
- Page 79 and 80: Site Preparation 61System CablesCab
- Page 81 and 82: Site Preparation 63Cable Illustrati
- Page 83 and 84: Site Preparation 65External Paralle
- Page 85 and 86: Appendix A: Transient ProtectionAC
- Page 87 and 88: Index—1—12.1 Inch LCD No-Cabine
- Page 90: B005-0000-1255 Dec 2002 Printed on
<strong>Sit</strong>e Preparation 47Considerations for Enclosed InstallationsTerminals that are mounted in an enclosure must meet certain thermaland environmental requirements as illustrated and noted in thefollowing pages.Ventilation ClearancesVerify that all clearance specifications are met as shown below.38 mm1.5 in.38 mm1.5 in.76 mm(3 in.)Door ShownOpen203 mm(8 in.)203 mm(8 in.)356 mm(14 in.)154 mm(6 in.)25 mm(1 in.)17315Note: The enclosure in this illustration is typical and is for clearancespecifications only.