11.07.2015 Views

ncr/doc/Kiosks/TechnicalManuals/7401_Kiosk_Sit... - Alsys Data

ncr/doc/Kiosks/TechnicalManuals/7401_Kiosk_Sit... - Alsys Data

ncr/doc/Kiosks/TechnicalManuals/7401_Kiosk_Sit... - Alsys Data

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sit</strong>e PreparationiiiAbout this BookGrounding InstructionsIn the event of a malfunction or breakdown, grounding provides apath of least resistance for electric current to reduce the risk of electricshock. This product is equipped with an electric cord having anequipment-grounding conductor and a grounding plug. The plug mustbe plugged into a matching outlet that is properly installed andgrounded in accordance with all local codes and ordinances. Do notmodify the plug provided – if it will not fit the outlet, have the properoutlet installed by a qualified electrician. Improper connection of theequipment-grounding conductor can result in a risk of electric shock.The conductor with insulation having an outer surface that is greenwith or without yellow stripes is the equipment-grounding conductor.If repair or replacement of the electric cord or plug is necessary, do notconnect the equipment-grounding conductor to a live terminal. Checkwith a qualified electrician or service personnel if the groundinginstructions are not completely understood, or if you are in doubt as towhether the product is properly grounded.Use only 3-wire extension cords that have 3-prong grounding plugsand 3-pole receptacles that accept the product’s plug. Repair or replacedamaged or worn cords immediately.This book provides site preparation information for terminalcomponents. Peripheral component and AC wiring site preparationinformation is NOT provided in this book. The associated reference<strong>doc</strong>uments are listed in the “Related <strong>Sit</strong>e Preparation <strong>Data</strong>” section.This book contains the information necessary for the preparation of asite that conforms to NCR specifications. It is very important that thesite complies with the requirements specified in the <strong>doc</strong>ument because,once the equipment has been installed, deficiencies in site preparationor the problems caused by these deficiencies are much more difficult todetect and correct. Further, failure to comply with these requirementsor to take proper steps to protect equipment against risks identified inthis <strong>doc</strong>ument may cause serious damage to the equipment and to thecustomer’s business.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!