23.11.2012 Views

Technical Service Manual - mbm-Service GmbH

Technical Service Manual - mbm-Service GmbH

Technical Service Manual - mbm-Service GmbH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATION INSTRUCTION<br />

IDL Harness Replacement ...Continued<br />

___________ STEP 10 ___________<br />

Check the physical dimension of the<br />

new cord. If the new cord is thicker it<br />

is necessary to enlarge the hole in the<br />

door frame. Enlarge the hole using a<br />

5/8” drill bit.<br />

___________ STEP 11 ___________<br />

Place strain relief around the new door<br />

harness.<br />

___________ STEP 12 ___________<br />

Route door harness through frame hole<br />

to allow connection to lamp holder<br />

wires.<br />

___________ STEP 13 ___________<br />

Strip lamp holder wires and door harness<br />

wires.<br />

___________ STEP 14 ___________<br />

Match wires (see wiring pairing) and<br />

crimp on end connectors to each set.<br />

___________ STEP 15 ___________<br />

Put the light channel back in its<br />

original position. Be sure wires are not<br />

pinched within the frame. Remove<br />

excess slack by pulling on door harness.<br />

___________ STEP 16 ___________<br />

Place the strain relief back into the<br />

door frame.<br />

___________ STEP 17 ___________<br />

Replace the glass insert. Make sure<br />

double sided tape is not bunched or<br />

lying outside of the door frame. The<br />

insert should slide into the light channel<br />

first, this may require force. Once<br />

in the channel then lay within the<br />

frame opening.<br />

___________ STEP 18 ___________<br />

Replace the back plastic. Match up<br />

existing screw holes and use existing<br />

screws to fasten.<br />

___________ STEP 19 ___________<br />

Replace the gasket and hang the door.<br />

NOTE:<br />

A test should be run before re-hang -<br />

ing the door. Simply support the<br />

door and plug it into the ballast<br />

receptacle. Plug the cooler in and<br />

see if the door light comes on.<br />

___________ STEP 20 ___________<br />

See figures 1 & 2.<br />

Route the door harness per figure 2.<br />

___________ STEP 21 ___________<br />

Place "P" clip as shown. Be sure all<br />

the slack in the door harness is<br />

removed before tightening the clip.<br />

Also, be sure the clip is placed in plane<br />

with the binge bearing.<br />

NOTE:<br />

If larger cord is being used you will<br />

also have to replace the p-clip. This<br />

will be included in the<br />

replacement kit.<br />

69<br />

___________ STEP 22 ___________<br />

Plug the harness receptacle into the<br />

ballast receptacle and reinstall the<br />

louver grill.<br />

___________ STEP 23 ___________<br />

Plug in the cabinet and test.<br />

_______ WIRE PAIRING ________<br />

Door harness to lamp holder<br />

The lamp holder combination will<br />

have two black wires and two white<br />

wires. The door harness will have<br />

either two black and two white wires<br />

or one green, one red, one black and<br />

one white wire. Below are the wire<br />

combinations for each.<br />

Multi colored door harness to lamp<br />

holder<br />

Green wire to Black wire<br />

Red wire to Black wire<br />

White Wire to White Wire<br />

Black Wire to White Wire<br />

White/Black door harness to lamp<br />

holder<br />

White Wire to White Wire<br />

Black Wire to Black Wire

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!