Technical Service Manual - mbm-Service GmbH
Technical Service Manual - mbm-Service GmbH
Technical Service Manual - mbm-Service GmbH
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INSTALLATION INSTRUCTION<br />
TEMPERATURE CONTROL REPLACEMENT CONTINUED.......<br />
___________ STEP 4 ___________<br />
Relay Connection Mounting:<br />
A. With slotted screw driver and<br />
plastic mallet or hammer, drive out<br />
knock out positioned on left side of<br />
ballast box. (See Figure 3).<br />
B. Install the supplied grommet*<br />
into the knockout hole. (See Figure 4).<br />
C. Mount relay to underside of<br />
unit on the left side of ballast box,<br />
and 3/4” back from the front edge<br />
of the underside.<br />
NOTE: Mount relay next to the<br />
ballast box, so that when the relay<br />
shield is installed it covers the relay<br />
and all exposed wiring.<br />
Relay should be anchored with two<br />
self-tapping screws, (supplied in kit),<br />
as pictured in Figure 5.<br />
*Grommet<br />
Figure 3. Driving out knockout<br />
Figure 4. Installing the grommet<br />
44<br />
Figure 5. Anchoring relay