23.11.2012 Views

Technical Service Manual - mbm-Service GmbH

Technical Service Manual - mbm-Service GmbH

Technical Service Manual - mbm-Service GmbH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATION INSTRUCTION<br />

TEMPERATURE CONTROL REPLACEMENT CONTINUED.......<br />

___________ STEP 4 ___________<br />

Relay Connection Mounting:<br />

A. With slotted screw driver and<br />

plastic mallet or hammer, drive out<br />

knock out positioned on left side of<br />

ballast box. (See Figure 3).<br />

B. Install the supplied grommet*<br />

into the knockout hole. (See Figure 4).<br />

C. Mount relay to underside of<br />

unit on the left side of ballast box,<br />

and 3/4” back from the front edge<br />

of the underside.<br />

NOTE: Mount relay next to the<br />

ballast box, so that when the relay<br />

shield is installed it covers the relay<br />

and all exposed wiring.<br />

Relay should be anchored with two<br />

self-tapping screws, (supplied in kit),<br />

as pictured in Figure 5.<br />

*Grommet<br />

Figure 3. Driving out knockout<br />

Figure 4. Installing the grommet<br />

44<br />

Figure 5. Anchoring relay

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!