1-1/2" 10"<br />
MAX.<br />
FINAL GRADE<br />
PIPE<br />
CONDUIT<br />
"OR"<br />
IF CONDUIT IS USED A MANHOLE / SPLICEBOX<br />
IS REQUIRED, SEE NOTE 7<br />
SEE SHEET D12 FOR NOTES<br />
COMMUNICATIONS LINE<br />
CUSTOMER INSTALLED<br />
SEE<br />
NOTE 4<br />
CABLE RISER<br />
D11<br />
SEE<br />
NOTE 3<br />
5' 5'<br />
15'<br />
MIN.<br />
FINAL GRADE<br />
(SEE NOTE 6)<br />
UTILITY SPLICING CREW<br />
TO COMPLETE RISER POLE<br />
(INCLUDING GROUNDING AND<br />
BONDING MATERIAL)<br />
CURB<br />
RISER<br />
12" FOR DIRECT BURIED CABLES<br />
WARNING RIBBON<br />
(DIRECT BURIED)<br />
24" MINIMUM COVER FOR SECONDARY<br />
30" MINIMUM COVER FOR PRIMARY<br />
TRAFFIC<br />
RISER LOCATION ON POLE<br />
RISER SHALL BE POSITIONED SO THERE IS A<br />
CLEAR VERTICAL PATH UP THE POLE TO<br />
LIPA'S SECONDARY WIRES.<br />
IMPORTANT:<br />
UNDER NO CIRCUMSTANCES SHALL AN<br />
EXISTING OVERHEAD SERVICE BE CONNECTED<br />
TO AN UNDERGROUND SERVICE.<br />
MULTIPLE SETS OF CABLE FEEDING<br />
MULTIPLE SERVICES MUST BE CLEARLY<br />
IDENTIFIED.<br />
Section 11 - Drawings<br />
DWG. BASED ON<br />
LIPA CS 2403