1-1/2" 10"<br />

MAX.<br />

FINAL GRADE<br />

PIPE<br />

CONDUIT<br />

"OR"<br />

IF CONDUIT IS USED A MANHOLE / SPLICEBOX<br />

IS REQUIRED, SEE NOTE 7<br />

SEE SHEET D12 FOR NOTES<br />

COMMUNICATIONS LINE<br />

CUSTOMER INSTALLED<br />

SEE<br />

NOTE 4<br />

CABLE RISER<br />

D11<br />

SEE<br />

NOTE 3<br />

5' 5'<br />

15'<br />

MIN.<br />

FINAL GRADE<br />

(SEE NOTE 6)<br />

UTILITY SPLICING CREW<br />

TO COMPLETE RISER POLE<br />

(INCLUDING GROUNDING AND<br />

BONDING MATERIAL)<br />

CURB<br />

RISER<br />

12" FOR DIRECT BURIED CABLES<br />

WARNING RIBBON<br />

(DIRECT BURIED)<br />

24" MINIMUM COVER FOR SECONDARY<br />

30" MINIMUM COVER FOR PRIMARY<br />

TRAFFIC<br />

RISER LOCATION ON POLE<br />

RISER SHALL BE POSITIONED SO THERE IS A<br />

CLEAR VERTICAL PATH UP THE POLE TO<br />

LIPA'S SECONDARY WIRES.<br />

IMPORTANT:<br />

UNDER NO CIRCUMSTANCES SHALL AN<br />

EXISTING OVERHEAD SERVICE BE CONNECTED<br />

TO AN UNDERGROUND SERVICE.<br />

MULTIPLE SETS OF CABLE FEEDING<br />

MULTIPLE SERVICES MUST BE CLEARLY<br />

IDENTIFIED.<br />

Section 11 - Drawings<br />

DWG. BASED ON<br />

LIPA CS 2403