Lennox HP29
Lennox HP29 Lennox HP29
VI − REFRIGERANT LINE NOISEIt is important to properly isolate the refrigerant lines toprevent unnecessary vibration. Line set contact with thestructure (wall,ceiling or floor) causes some objectionablenoise when vibration is translated into sound.The following illustrations demonstrates procedures whichensure proper refrigerant line set isolation. Figure 17shows how to install line sets on vertical runs. Figure 18shows how to install line sets on horizontal runs. Figure 19shows how to make a transition from horizontal to vertical.Finally, figure 20 shows how to place the outdoor unit andline set.REFRIGERANT LINE SETSHOW TO INSTALL VERTICAL RUNS(new construction shown)NOTE-Similar installation practices should be used if lineset is to be installed on exterior of outside wall.Outside WallIMPORTANT-Refrigerant linesmust not contact wall.Vapor LineLiquid LineWood BlockBetween StudsWire TieInside WallStrapLiquid LineSleeveVapor Line (wrappedwith Armaflex)Wire TieOutside WallWood BlockWire TieStrapCaulkPVC PipeFiber GlassInsulationSleeveIMPORTANT-Refrigerantlines mustnot contact structure.FIGURE 17Page 16
REFRIGERANT LINE SETS:HOW TO INSTALL HORIZONTAL RUNSTo hang line set from joist or rafter,use either metal strapping materialor anchored heavy nylon wire ties.Wire Tie(around vapor line only)8 feetFloor Joist orRoof Rafter8 feetTape or Wire TieStrapping Material (around vapor line only)Tape or Wire TieMetal SleeveFloor Joist or Roof RafterStrap the vapor line to the joist or rafter at 8 ft.intervals then strap the liquid line to the vapor line.HOW TO MAKE TRANSITION FROMVERTICAL TO HORIZONTALAnchored Heavy NylonWire Tie or AutomotiveMuffler-Type HangerFIGURE 18OUTSIDE UNIT PLACEMENT AND INSTALLATIONInstall Unit Away From Windowsand Away FromNeighbors’ WindowsWallStudStrapLiquid LineTo VaporLineMetalSleeveLiquidLineVapor Line Wrappedin ArmaflexFIGURE 19 FIGURE 20Page 17Two 90° Elbows Installed in Line SetWill Help Reduce Line Set Vibration
- Page 1: Service LiteratureCorp. 9709−L5Re
- Page 5 and 6: 3 − Potential Relay K31 (Start)Al
- Page 7 and 8: 9 − Defrost SystemUnits built Apr
- Page 9 and 10: B − Compressor (Reciprocating & S
- Page 11 and 12: IMPORTANTService valves are closed
- Page 13 and 14: IV − CHARGINGUnit charge is based
- Page 15: TABLE 13SUBCOOLING METHODAMBIENT TE
- Page 19 and 20: HP29 SINGLE-PHASE WITH RECIPROCATIN
- Page 21 and 22: HP29 SINGLE−PHASE WITH SCROLL COM
- Page 23 and 24: HP29 SINGLE−PHASE WITH SCROLLCOMP
- Page 25 and 26: HP29 THREE−PHASE WITH RECIPROCATI
- Page 27: HP29 THREE-PHASE OPERATING SEQUENCE
REFRIGERANT LINE SETS:HOW TO INSTALL HORIZONTAL RUNSTo hang line set from joist or rafter,use either metal strapping materialor anchored heavy nylon wire ties.Wire Tie(around vapor line only)8 feetFloor Joist orRoof Rafter8 feetTape or Wire TieStrapping Material (around vapor line only)Tape or Wire TieMetal SleeveFloor Joist or Roof RafterStrap the vapor line to the joist or rafter at 8 ft.intervals then strap the liquid line to the vapor line.HOW TO MAKE TRANSITION FROMVERTICAL TO HORIZONTALAnchored Heavy NylonWire Tie or AutomotiveMuffler-Type HangerFIGURE 18OUTSIDE UNIT PLACEMENT AND INSTALLATIONInstall Unit Away From Windowsand Away FromNeighbors’ WindowsWallStudStrapLiquid LineTo VaporLineMetalSleeveLiquidLineVapor Line Wrappedin ArmaflexFIGURE 19 FIGURE 20Page 17Two 90° Elbows Installed in Line SetWill Help Reduce Line Set Vibration