11.07.2015 Views

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The maximum deduction shall be ten percent (10%) <strong>of</strong> the amount <strong>of</strong> thecontract, the Procuring Entity shall rescind the contract, without prejudiceto other courses <strong>of</strong> action and remedies open to it.10. The site investigation reports are: none12.5. In case <strong>of</strong> semi-permanent structures, such as buildings <strong>of</strong> types 1, 2, and3 as classified under the National Building Code <strong>of</strong> the Philippines,concrete/asphalt roads, concrete river control, drainage, irrigation linedcanals, river landing, deep wells, rock causeway, pedestrian overpass, andother similar semi-permanent structures: Five (5) years.13. If the Contractor is a joint venture, “All partners to the joint venture shallbe jointly and severally liable to the Procuring Entity.”21.2. The Arbiter is:Construction Industry Arbitration Commission4F, Jupiter Building56 Jupiter Street, Bel Air Makati City21.3. No further instructions.26.1. No further instructions.29.1. Day works are applicable at the rate shown in the Contractor’s original Bid.31.1. The Contractor shall submit the Detailed Program <strong>of</strong> Work to theProcuring Entity’s Representative within fourteen (14) calendar daysupon receipt <strong>of</strong> the Notice to Proceed.31.3. The period between Program <strong>of</strong> Work updates is seven (7) days.The amount to be withheld for late submission <strong>of</strong> an updated Program <strong>of</strong>Work is 1% <strong>of</strong> every Progress Billing <strong>of</strong> the Contractor.34.3. The Funding Source is the Government <strong>of</strong> the Philippines.37.1. No further instructions.39.1. The amount <strong>of</strong> the advance payment is 15% <strong>of</strong> the Contract Amount.40.1. No further instructions.40.3. No further instructions.42.2. No further instructions.48. No further instructions.51.1. The date by which operating and maintenance manuals are required iswithin seven (7) working days upon satisfactory completion.The date by which “as built” drawings are required is within seven (7)working days upon satisfactory completion.79<strong>Clark</strong> Development CorporationSection V Special Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!