Asphalt Overlay of CDC Roads - Clark Freeport Zone
Asphalt Overlay of CDC Roads - Clark Freeport Zone
Asphalt Overlay of CDC Roads - Clark Freeport Zone
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Special Conditions <strong>of</strong> ContractGCC Clause1.16 The Intended Completion Date is [Insert date].1.21 The Procuring Entity is <strong>Clark</strong> Development Corporation Bldg. 2122 E.Quirino St. <strong>CDC</strong> Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines.1.22 The Procuring Entity’s Representative isEngr. Rene S. ArcillaOfficer-In-ChargeEngineering, Construction and Maintenance DepartmentBldg. 2125, E. Quirino Avenue corner Carlos P. Garcia St.<strong>CDC</strong> Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines 2023The Duly Authorized Representative is Engr. Alan C. Turla1.23 The Site is located at <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong> and is defined in drawings No.[Insert Number].1.27 The Start Date is within seven (7) calendar days upon receipt <strong>of</strong> theNotice to Proceed.1.30The Works involves the asphalt overlay <strong>of</strong> E. Aguinaldo Street, MalomaStreet, Magsaysay Avenue, Abacan Street and Chico Street in accordancewith the Scope <strong>of</strong> Works and Technical Specifications including compliancewith the latest DPWH Standards and Specifications.2.2 If different dates are specified for completion <strong>of</strong> the Works by section(“sectional completion”), these dates should be listed here5.1. The Procuring Entity shall give possession <strong>of</strong> all parts <strong>of</strong> the Site to theContractor upon receipt <strong>of</strong> Notice to Proceed.6.5. The Contractor shall employ the following Key Personnel:[List key personnel by name and designation]7.1. No further instructions.7.4(c)The Contractor had submitted the required warranty security.8.1. No further instructions.9.1. The applicable liquidated damages is one tenth (1/10) <strong>of</strong> one percent <strong>of</strong>the cost <strong>of</strong> the unperformed portion for every day <strong>of</strong> delay.78<strong>Clark</strong> Development CorporationSection V Special Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>