11.07.2015 Views

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

given by the Procuring Entity or to perform any provisions <strong>of</strong> thecontract, or due to adjustment <strong>of</strong> plans to suit field conditions as foundnecessary during construction. The Contractor shall immediatelycomply with such order to suspend the work wholly or partly.45.2. The Contractor or its duly authorized representative shall have theright to suspend work operation on any or all projects/activities alongthe critical path <strong>of</strong> activities after fifteen (15) calendar days from date<strong>of</strong> receipt <strong>of</strong> written notice from the Contractor to the districtengineer/regional director/consultant or equivalent <strong>of</strong>ficial, as the casemay be, due to the following:(a)(b)(c)(d)(e)There exist right-<strong>of</strong>-way problems which prohibit the Contractorfrom performing work in accordance with the approvedconstruction schedule.Requisite construction plans which must be owner-furnished arenot issued to the contractor precluding any work called for bysuch plans.Peace and order conditions make it extremely dangerous, if notpossible, to work. However, this condition must be certified inwriting by the Philippine National Police (PNP) station which hasresponsibility over the affected area and confirmed by theDepartment <strong>of</strong> Interior and Local Government (DILG) RegionalDirector.There is failure on the part <strong>of</strong> the Procuring Entity to delivergovernment-furnished materials and equipment as stipulated inthe contract.Delay in the payment <strong>of</strong> Contractor’s claim for progress billingbeyond forty-five (45) calendar days from the time theContractor’s claim has been certified to by the procuring entity’sauthorized representative that the documents are completeunless there are justifiable reasons there<strong>of</strong> which shall becommunicated in writing to the Contractor.45.3. In case <strong>of</strong> total suspension, or suspension <strong>of</strong> activities along the criticalpath, which is not due to any fault <strong>of</strong> the Contractor, the elapsed timebetween the effective order <strong>of</strong> suspending operation and the order toresume work shall be allowed the Contractor by adjusting the contracttime accordingly.73<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!