11.07.2015 Views

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

33. Bill <strong>of</strong> Quantitiesthe PROCURING Entity’s Representative either at the ManagementConference or after the Management Conference and stated in writingto all who attended the Conference.33.1. The Bill <strong>of</strong> Quantities shall contain items <strong>of</strong> work for the construction,installation, testing, and commissioning <strong>of</strong> work to be done by theContractor.33.2. The Bill <strong>of</strong> Quantities is used to calculate the Contract Price. TheContractor is paid for the quantity <strong>of</strong> the work done at the rate in theBill <strong>of</strong> Quantities for each item.33.3. If the final quantity <strong>of</strong> any work done differs from the quantity in theBill <strong>of</strong> Quantities for the particular item and is not more than twentyfive percent (25%) <strong>of</strong> the original quantity, provided the aggregatechanges for all items do not exceed ten percent (10%) <strong>of</strong> the Contractprice, the Procuring Entity’s Representative shall make the necessaryadjustments to allow for the changes subject to applicable laws, rules,and regulations.33.4. If requested by the Procuring Entity’s Representative, the Contractorshall provide the Procuring Entity’s Representative with a detailed costbreakdown <strong>of</strong> any rate in the Bill <strong>of</strong> Quantities.34. Instructions, Inspections and Audits34.1. The Procuring Entity’s personnel shall at all reasonable times duringconstruction <strong>of</strong> the Work be entitled to examine, inspect, measure andtest the materials and workmanship, and to check the progress <strong>of</strong> theconstruction.34.2. If the Procuring Entity’s Representative instructs the Contractor tocarry out a test not specified in the Specification to check whether anywork has a defect and the test shows that it does, the Contractor shallpay for the test and any samples. If there is no defect, the test shallbe a Compensation Event.34.3. The Contractor shall permit the Funding Source named in the SCC toinspect the Contractor’s accounts and records relating to theperformance <strong>of</strong> the Contractor and to have them audited by auditorsappointed by the Funding Source, if so required by the FundingSource.66<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!