accordance with approved plans and specifications andcontract provisions;(iv)(v)Deployment <strong>of</strong> committed equipment, facilities, supportstaff and manpower; andRenewal <strong>of</strong> the effectivity dates <strong>of</strong> the performancesecurity after its expiration during the course <strong>of</strong> contractimplementation.(c)(d)Assignment and subcontracting <strong>of</strong> the contract or any partthere<strong>of</strong> or substitution <strong>of</strong> key personnel named in the proposalwithout prior written approval by the procuring entity.Poor performance by the contractor or unsatisfactory qualityand/or progress <strong>of</strong> work arising from his fault or negligence asreflected in the Constructor's Performance Evaluation System(“CPES”) rating sheet. In the absence <strong>of</strong> the CPES rating sheet,the existing performance monitoring system <strong>of</strong> the procuringentity shall be applied. Any <strong>of</strong> the following acts by theconstructor shall be construed as poor performance:(i)(ii)Negative slippage <strong>of</strong> 15% and above within the criticalpath <strong>of</strong> the project due entirely to the fault or negligence<strong>of</strong> the contractor; andQuality <strong>of</strong> materials and workmanship not complying withthe approved specifications arising from the contractor'sfault or negligence.(e)Willful or deliberate abandonment or non-performance <strong>of</strong> theproject or contract by the contractor resulting to substantialbreach there<strong>of</strong> without lawful and/or just cause.In addition to the penalty <strong>of</strong> suspension, the performance securityposted by the contractor shall also be forfeited.20. Force Majeure, Release from Performance20.1. For purposes <strong>of</strong> this Contract the terms “force majeure” and “fortuitousevent” may be used interchangeably. In this regard, a fortuitous eventor force majeure shall be interpreted to mean an event which theContractor could not have foreseen, or which though foreseen, wasinevitable. It shall not include ordinary unfavorable weatherconditions; and any other cause the effects <strong>of</strong> which could have beenavoided with the exercise <strong>of</strong> reasonable diligence by the Contractor.20.2. If this Contract is discontinued by an outbreak <strong>of</strong> war or by any otherevent entirely outside the control <strong>of</strong> either the Procuring Entity or the60<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!