11.07.2015 Views

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

18.6. If this Contract is terminated, the Contractor shall stop workimmediately, make the Site safe and secure, and leave the Site as soonas reasonably possible.19. Procedures for Termination <strong>of</strong> Contracts19.1. The following provisions shall govern the procedures for thetermination <strong>of</strong> this Contract:(a)(b)Upon receipt <strong>of</strong> a written report <strong>of</strong> acts or causes which mayconstitute ground(s) for termination as aforementioned, or uponits own initiative, the Implementing Unit shall, within a period <strong>of</strong>seven (7) calendar days, verify the existence <strong>of</strong> such ground(s)and cause the execution <strong>of</strong> a Verified Report, with all relevantevidence attached;Upon recommendation by the Implementing Unit, the Head <strong>of</strong>the Procuring Entity shall terminate this Contract only by awritten notice to the Contractor conveying the termination <strong>of</strong>this Contract. The notice shall state:(i)(ii)(iii)(iv)that this Contract is being terminated for any <strong>of</strong> theground(s) afore-mentioned, and a statement <strong>of</strong> the actsthat constitute the ground(s) constituting the same;the extent <strong>of</strong> termination, whether in whole or in part;an instruction to the Contractor to show cause as to whythis Contract should not be terminated; andSpecial instructions <strong>of</strong> the Procuring Entity, if any.The Notice to Terminate shall be accompanied by a copy <strong>of</strong> theVerified Report;(c)(d)Within a period <strong>of</strong> seven (7) calendar days from receipt <strong>of</strong> theNotice <strong>of</strong> Termination, the Contractor shall submit to the Head<strong>of</strong> the Procuring Entity a verified position paper stating why thecontract should not be terminated. If the Contractor fails toshow cause after the lapse <strong>of</strong> the seven (7) day period, eitherby inaction or by default, the Head <strong>of</strong> the Procuring Entity shallissue an order terminating the contract;The Procuring Entity may, at anytime before receipt <strong>of</strong> theBidder’s verified position paper to withdraw the Notice toTerminate if it is determined that certain items or works subject<strong>of</strong> the notice had been completed, delivered, or performedbefore the Contractor’s receipt <strong>of</strong> the notice;58<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!