6.6. The Contractor shall be held liable for design and structural defectsand/or failure <strong>of</strong> the completed project within the warranty periodsspecified in Section 62.2.3.2. <strong>of</strong> R.A. 9184 and its Implementing Rulesand Regulations.6.7. The Contractor shall be responsible for the safety <strong>of</strong> all activities on theSite.6.8. The Contractor shall carry out all instructions <strong>of</strong> the Procuring Entity’sRepresentative that comply with the applicable laws where the Site islocated.6.9. The Contractor shall employ the key personnel named in the Schedule<strong>of</strong> Key Personnel, as referred to in the SCC, to carry out thesupervision <strong>of</strong> the Works. The Procuring Entity will approve anyproposed replacement <strong>of</strong> key personnel only if their relevantqualifications and abilities are equal to or better than those <strong>of</strong> thepersonnel listed in the Schedule.6.10. If the Procuring Entity’s Representative asks the Contractor to removea member <strong>of</strong> the Contractor’s staff or work force, for justifiable cause,the Contractor shall ensure that the person leaves the Site within seven(7) days and has no further connection with the Work in this Contract.6.11. During Contract implementation, the Contractor and his subcontractorsshall abide at all times by all labor laws, including child labor relatedenactments, and other relevant rules.6.12. The Contractor shall submit to the Procuring Entity for consent thename and particulars <strong>of</strong> the person authorized to receive instructionson behalf <strong>of</strong> the Contractor.6.13. The Contractor shall cooperate and share the Site with othercontractors, public authorities, utilities, and the Procuring Entitybetween the dates given in the schedule <strong>of</strong> other contractorsparticularly when they shall require access to the Site. The Contractorshall also provide facilities and services for them during this period.The Procuring Entity may modify the schedule <strong>of</strong> other contractors,and shall notify the Contractor <strong>of</strong> any such modification thereto.6.14. Should anything <strong>of</strong> historical or other interest or <strong>of</strong> significant value beunexpectedly discovered on the Site, it shall be the property <strong>of</strong> theProcuring Entity. The Contractor shall notify the Procuring Entity’sRepresentative <strong>of</strong> such discoveries and carry out the Procuring Entity’sRepresentative’s instructions in dealing with them.6.15. The Contractor shall provide all the necessary equipment, personnel,instruments, documents and others to carry out specified tests.47<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> the Contract<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!